ASSET PRESERVATION-REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS BASILAN CIRCUMFERENTIAL ROAD (S00005BL) K 0008+800 K 0009+050, SLOPE PROTECTION WORKS (GROUTED RIPRAP/ STONE MASONRY) (L/S), ISABE
ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS BASILAN CIRCUMFERENTIAL ROAD (S00005BL) K 0008+800 K 0009+050, SLOPE PROTECTION WORKS (GROUTED RIPRAP/STONE MASONRY) (L/S), ISABE is a DPWH-tracked public work in Isabela City DEO, Region IX. Reported contract value: ₱84,426,697.03. Status: Reported complete (DPWH). Contractor on record: RCDG CONST CORP. Figures trace to dpwh.