Roads22FG0016

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) JCT. GUIJALO-SAN VICENTE ROAD LEADING TO SAN VICENTE PORT - STA.6+350.00 - STA.7+600.00, CARAMOAN, CAMARINES SUR

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) JCT. GUIJALO-SAN VICENTE ROAD LEADING TO SAN VICENTE PORT - STA.6+350.00 - STA.7+600.00, CARAMOAN, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 4th DEO, Region V. Reported contract value: ₱49,614,510.00. Status: Reported complete (DPWH). Contractor on record: IA FERRER CONST. Figures trace to dpwh.

Camarines Sur 4th DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FG0016 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-09-07 → 2025-06-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱39,691,608 per km= 1.8x the Region V median (n=151)

Contract cost ₱49,614,510 ÷ 1.25 km read from the DPWH title (“STA.6+350.00 - STA.7+600.00”; K-post / station range length). National percentile: 77. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) JCT. GUIJALO-SAN VICENTE ROAD LEADING TO SAN VICENTE PORT - STA.6+350.00 - STA.7+600.00, CARAMOAN, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, San Isidro, Lagonoy, Camarines Sur
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Camarines Sur 4th DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

55 projects · ₱692.2M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) JCT. GUIJALO-SAN VICENTE ROAD LEADING TO SAN VICENTE PORT. STA.7+600.00 - STA.8+700.00CARAMOAN, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2023₱49.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION ROAD, BRGY. MAYBATO, PARACALE TO BRGY. MALANCAO - BASUD, LABO, CAMARINES NORTE

Camarines Norte DEO, Region V

2025₱48.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) JCT. GUIJALO - SAN VICENTE ROAD LEADING TO SAN VICENTE PORTSTA.5+000.00 - STA.6+350.00 CARAMOAN, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2021₱47.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FLOOD MITIGATION STRUCTURECARAPDAPAN CREEK BARANGAY ABO, BARANGAY SAN MIGUEL, BARANGAY CASUNA, TIGAON, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2025₱38.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) PRESENTACION TO CARAMOAN ROAD LEADING TO ISLETS, BEACHES, ROCK FORMATION, CAVES, LAGOON, CARAMOAN NATURAL PARK

Camarines Sur 4th DEO, Region V

2023₱31.0M
Reported complete (DPWH)
No sat.

REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROAD ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD K0553+107 - K0553+340; K0560+351 - K0560+395; K0563+285 - K0563+979, CARAMOAN, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2023₱30.4M
Reported complete (100% progress, DPWH status On-Going)
View all 55 projects →

4. Implementation

Contract Amount

₱49,614,510.00

Progress

Reported complete (DPWH)

Start Date

March 17, 2022

Target End

August 2, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurCaramoanSan Vicente
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.