Buildings and Facilities17HG0224No coordinates published by DPWH

CONSTRUCTION OF UNIQUE WORKSHOP BUILDING, BADIAN NHS, BADIAN, CEBU

CONSTRUCTION OF UNIQUE WORKSHOP BUILDING, BADIAN NHS, BADIAN, CEBU is a DPWH-tracked public work in Cebu 2nd DEO, Region VII. Reported contract value: ₱2,683,388.54. Status: Reported complete (DPWH). Contractor on record: APRIL ROSE ENT. Figures trace to dpwh.

Cebu 2nd DEO, Region VII

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region VII

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱2,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROI-17-0000992 · ₱7,024,000 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17HG0224 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF UNIQUE WORKSHOP BUILDING, BADIAN NHS, BADIAN, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Poblacion, Talisay City, Cebu
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROI-17-0000992

₱7,024,000.00 · FY2017

Released to Division of Dagupan To City en in (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

78 projects · ₱455.7M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD_MANAGEMENT_PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ALO SEAWALL ALONG N. BACALSO AVE., OSLOB, CEBU

Cebu 2nd DEO, Region VII

2019₱29.4M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT - CONSTRUCTION OF LUSAPON FLOOD CONTROL, BOLJOON, CEBU

Cebu 2nd DEO, Region VII

2019₱24.8M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF DALAGUETE RIVER FLOOD CONTROL STRUCTURE (UPSTREAM), K0085+739, DALAGUETE, CEBU

Cebu 2nd DEO, Region VII

2019₱19.0M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT- CONSTRUCTION OF KAWAYAN RIVER FLOOD CONTROL, DALAGUETE, CEBU

Cebu 2nd DEO, Region VII

2019₱19.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N. BACALSO AVE (CEBU SOUTH RD) - K0121+947 - K0122+808

Cebu 2nd DEO, Region VII

2023₱17.9M
Reported complete (DPWH)
No sat.

A. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. KANLUNSING, TUBURAN, CEBU; B. CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO LABANGON, BRGY. KABANGKALAN, TUBURAN, CEBU;C. CONSTRUCTION OF MULTI-PURPOSE BU

Cebu 3rd DEO, Region VII

2020₱14.7M
Reported complete (DPWH)
View all 78 projects →

4. Implementation

Contract Amount

₱2,683,388.54

Progress

Reported complete (DPWH)

Start Date

January 3, 2018

Target End

March 28, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)Cebu
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.