Buildings and Facilities23BC0126

CONSTRUCTION OF 1 STOREY 5 CLASSROOM WITH CR AT CAPANNIKIAN ELEMENTARY SCHOOL, CLAVERIA, CAGAYAN

CONSTRUCTION OF 1 STOREY 5 CLASSROOM WITH CR AT CAPANNIKIAN ELEMENTARY SCHOOL, CLAVERIA, CAGAYAN is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱10,453,292.45. Status: Reported complete (DPWH). Contractor on record: A NIDUAZA BUILDERS. Figures trace to dpwh.

Cagayan 2nd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23BC0126 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-02-02 → 2025-07-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱2,090,658 per classroom= 1.6x the Region II median (n=370)

Contract cost ₱10,453,292 ÷ 5 classroom read from the DPWH title (“5 CLASSROOM”; classroom count in title). National percentile: 63. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 STOREY 5 CLASSROOM WITH CR AT CAPANNIKIAN ELEMENTARY SCHOOL, CLAVERIA, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Pata Flood Control Structure along Pata River, Pata, Claveria, Cagayan
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Cagayan 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

29 projects · ₱156.5M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MANILA NORTH RD-K0662+069-K0663+000, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2022₱38.1M
Reported complete (DPWH)
No sat.

CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-BIDDUANG BAY VIEW INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, BIDDUANG, PAMPLONA, CAGAYAN

Cagayan 2nd DEO, Region II

2022₱19.6M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. MALILITAO TO BRGY. MAPULA-PULA FMR, BRGY. MALILITAO AND BRGY. MAPULA-PULA, CLAVERIA, CAGAYAN

Cagayan 2nd DEO, Region II

2023₱11.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROGMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS ROAD ALONG MINANGA-NAMUAC ROAD LEADING TO ESTUARY SAND DUNES AND BEACHES, SANCHEZ MIRA, CAGAYAN

Cagayan 2nd DEO, Region II

2019₱9.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONIMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - MANILA NORTH ROAD TO CALLUNGAN-MASISI

Cagayan 2nd DEO, Region II

2024₱9.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, PACAC-BINUBUNGAN CONNECTING TO COCONUT FOOD PROCESSING AREA, ALLACAPAN, CAGAYAN, BRGY. PACAC-BINUBUNGAN, ALLACAPAN, CAGAYAN

Cagayan 2nd DEO, Region II

2020₱9.8M
Reported complete (DPWH)
View all 29 projects →

4. Implementation

Contract Amount

₱10,453,292.45

Progress

Reported complete (DPWH)

Start Date

September 8, 2023

Target End

March 30, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanClaveriaCapannikian
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.