Construction of Revetment22LA0044

Construction of Revetment along Agusan River, Sta. 0+807.71 - Sta. 1+156.52 (RS), Purok 3 Brgy. Osmeña to Purok 1, Poblacion, Compostela, Davao de Oro

Construction of Revetment along Agusan River, Sta. 0+807.71 - Sta. 1+156.52 (RS), Purok 3 Brgy. Osmeña to Purok 1, Poblacion, Compostela, Davao de Oro is a DPWH-tracked public work in COMPOSTELA (DAVAO DE ORO), DAVAO DE ORO, Region XI. Reported contract value: ₱48,999,996.26. Status: Reported complete (DPWH). Contractor on record: THREE W BUILDERS INC. Figures trace to sumbong.

COMPOSTELA (DAVAO DE ORO), DAVAO DE ORO, Region XI
Region: Region XI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0003152 · ₱756,564,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22LA0044 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-08-29 → 2024-12-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱140,478 per linear m= 1.0x the Region XI median (n=93)

Contract cost ₱48,999,996 ÷ 348.81 linear m read from the DPWH title (“Sta. 0+807.71 - Sta. 1+156.52”; station range length (Sta. a+b to c+d)). National percentile: 54. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Davao de Oro

Based on the coordinates published with the DPWH record and NOAH file Compostella Valley.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Revetment along Agusan River, Sta. 0+807.71 - Sta. 1+156.52 (RS), Purok 3 Brgy. Osmeña to Purok 1, Poblacion, Compostela, Davao de Oro

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Batutu River leading to Manat River, Barangay Banag-Banag, Montevista, Davao de Oro
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0003152

₱756,564,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002642

₱535,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002791

₱62,400,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002783

₱45,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0006775

₱37,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

416 projects · ₱20.3B total · 2 flags

4. Implementation

Contract Amount

₱48,999,996.26

Progress

Reported complete (DPWH)

Start Date

February 15, 2022

Target End

November 5, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “Construction of Revetment along Agusan River, Sta. 0+807.71 - Sta. 1+156.52 (RS), Purok 3 Brgy. Osmeña to Purok 1, Poblacion, Compostela, Davao de Oro.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/784caf1f-c574-4250-9686-f6e15b576532

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao de OroCompostelaPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.