Buildings and Facilities21OE0126

CONSTRUCTION AND REHABILITATION OF MULTIPURPOSE BUILDING, ZONE 1-12 BARANGAY 1-146, MANILA

CONSTRUCTION AND REHABILITATION OF MULTIPURPOSE BUILDING, ZONE 1-12 BARANGAY 1-146, MANILA is a DPWH-tracked public work in North Manila DEO, National Capital Region. Reported contract value: ₱24,009,063.08. Status: Reported complete (DPWH). Contractor on record: ALLEYWAY CONST. Figures trace to dpwh.

North Manila DEO, National Capital Region
Region: National Capital Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21OE0126 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-11-03 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION AND REHABILITATION OF MULTIPURPOSE BUILDING, ZONE 1-12 BARANGAY 1-146, MANILA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structures and Facilities along Blumentritt, Sta. 0+000.00 to Sta. 0+297.20, Manila City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

North Manila DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

49 projects · ₱1.0B total · 1 flags

Other projects by this contractor

No sat.

MFO 2-FLOOD MANAGMENT SERVICES CONSTRUCTION/MAINTENANCE OF LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM: DRAINAGE IMPROVMENT ALONG YUSECO (INCLUDING KABULUSAN OUT FALL) TONDO, MANILA

North Manila DEO, National Capital Region

2017₱48.9M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT AND PATHWAYS, ZONE 1, 2, & 3, MANILA CITY

North Manila DEO, National Capital Region

2018₱47.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL- PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT AND PATHWAYS, ZONE 4, 5 & 6, MANILA CITY

North Manila DEO, National Capital Region

2018₱47.5M
Reported complete (DPWH)
No sat.

Rehabilitation of Drainage System at Zone 1-12, Tondo, Manila City

CITY OF MANILA (METROPOLITAN MANILA), CITY OF MANILA, National Capital Region

2022₱47.5M
Reported complete (DPWH)
No sat.

MFO 2 - FLOOD MANAGEMENT SERVICES CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD MITIGATION/STRUCTURES AND DRAINAGE SYSTEMS - M. EARNSHAW AND GOV. FORBES STREET, SAMPALOC, MANILA SAMPALOC, MANILA CITY

North Manila DEO, National Capital Region

2017₱46.3M
Reported complete (DPWH)
No sat.

REHABILITATION / IMPROVEMENT OF ROADS AND ALLEYS INCLUDING DRAINAGE, BRGY. 1-146, MANILA CITY

North Manila DEO, National Capital Region

2020₱39.6M
Reported complete (DPWH)
View all 49 projects →

4. Implementation

Contract Amount

₱24,009,063.08

Progress

Reported complete (DPWH)

Start Date

January 10, 2022

Target End

December 20, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION AND REHABILITATION OF MULTIPURPOSE BUILDING, ZONE 1-12 BARANGAY 1-146, MANILA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/7a0980b7-ae11-4b37-8e23-fcdf7b4cdadf

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaTondo I/IIBarangay 144
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.