Roads22HA0047

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT) - K0016+680 - K0016+960, K0025+000 - K0025+400

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT) - K0016+680 - K0016+960, K0025+000 - K0025+400 is a DPWH-tracked public work in Bohol 1st DEO, Region VII. Reported contract value: ₱27,651,680.00. Status: Reported complete (DPWH). Contractor on record: CEVIC CONST. Figures trace to dpwh.

Bohol 1st DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22HA0047 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-04 → 2015-08-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱40,664,235 per km= 1.3x the Region VII median (n=149)

Contract cost ₱27,651,680 ÷ 0.68 km read from the DPWH title (“K0016+680 - K0016+960; K0025+000 - K0025+400”; K-post / station range length). National percentile: 79. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT) - K0016+680 - K0016+960, K0025+000 - K0025+400

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control / Drainage Projects, Tagbilaran City, Bohol
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Bohol 1st DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

35 projects · ₱411.9M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - CONSTRUCTION OF TANGNAN ROAD TO KALIKASAN BEACH, ALMIRA DIVING RESORT, MOLAVE CLIFF DIVING RESORT AND ALEXIS CLIFF DIVE RESORT, PANGLAO, BOHOL

Bohol 1st DEO, Region VII

2022₱29.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF DIVERSION ROAD IN FATIMA,

Bohol 2nd DEO, Region VII

2023₱26.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPCIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL ROAD - K0180+015 - K

Bohol 3rd DEO, Region VII

2025₱24.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0191 + 00

Bohol 3rd DEO, Region VII

2025₱24.4M
Reported complete (DPWH)
No sat.

001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS - LOAY INTERIOR RD- K0122+155- K0122+604, K0139+582 - K0139+765, TRINIDAD AND SAN MIGUEL. BOHOL

Bohol 2nd DEO, Region VII

2020₱23.1M
Reported complete (DPWH)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAMGED PAVED ROADS - SECONDARY ROADS - TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT) - K0008+875 - K0009+000, K0041+363 - K0041+552, K0055+326 - K0055+700

Bohol 1st DEO, Region VII

2023₱19.7M
Reported complete (DPWH)
View all 35 projects →

4. Implementation

Contract Amount

₱27,651,680.00

Progress

Reported complete (DPWH)

Start Date

March 24, 2022

Target End

October 26, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholMaribojocLagtangon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.