Roads21FH0105

CONCRETING OF BRGY. BOCON TO BRGY. SABLOYON FMR, BRGY. BOCON & BRGY. SABLOYON, CARAMORAN, CATANDUANES

CONCRETING OF BRGY. BOCON TO BRGY. SABLOYON FMR, BRGY. BOCON & BRGY. SABLOYON, CARAMORAN, CATANDUANES is a DPWH-tracked public work in Catanduanes DEO, Region V. Reported contract value: ₱9,798,759.38. Status: Reported complete (DPWH). Contractor on record: JR CONTRACTOR. Figures trace to dpwh.

Catanduanes DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱48,730 (shared by many projects, not this project's own line)

    Possible match · score 0.72

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21FH0105 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-09-05 → 2019-09-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. BOCON TO BRGY. SABLOYON FMR, BRGY. BOCON & BRGY. SABLOYON, CARAMORAN, CATANDUANES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 72%

UACS
18001
Amount
₱48,730,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure - Construction of River Control of Cagayan River, Brgy. Bulala, Camalaniugan, Cagayan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Catanduanes DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

50 projects · ₱308.7M total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHAB. OF CONCRETE ROAD-REHAB/IMPVT OF BRGY. CAVINITAN TO BRGY. PAJO ROAD CONNECTING PROPOSED VIRAC TOURISM

Catanduanes DEO, Region V

2021₱27.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM - TWO (2) UNITS (7X18) SCIENCE LABORAORY AND TWO (2) UNITS (7X18) ICT LABORATORY SCHOOL BUILDING, SICMIL INTEGRATED SCHOOL, GIGMOTO, CATANDUANES

Catanduanes DEO, Region V

2018₱19.9M
Reported complete (DPWH)
No sat.

REHABILITATION/IMPROVEMENT OF BRGY. CALATAGAN TIBANG LEADING TO PROPOSED VIRAC AGRI-TOURISM SITES, VIRAC, CATANDUANES

Catanduanes DEO, Region V

2020₱15.2M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT- OFF-CARRIAGEWAY IMPROVEMENT -SECONDARY ROADS- OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION -CATANDUANES CIRCUMFERENTIAL ROAD K0008+000 -K0008+726, K0008+780 -K0008+807, K0008+984 - K0010+625

Catanduanes DEO, Region V

2022₱14.7M
Reported complete (DPWH)
No sat.

REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE, JCT. BATO-BARAS ROAD K0013+380-K0013+389 & K0013+700-K0014+000, BATO, CATANDUANES

Catanduanes DEO, Region V

2018₱13.2M
Reported complete (DPWH)
No sat.

EMERGENCY REPAIR/MAINTENANCE OF CATANDUANES CIRCUMFERENTIAL ROAD SAN ANDRES-VIRAC ROAD SECTION, LICTIN, SAN ANDRES, CATANDUANES (K0190+490-K0192+000) AT INT. SECTION

Catanduanes DEO, Region V

2016₱11.8M
Reported complete (DPWH)
View all 50 projects →

4. Implementation

Contract Amount

₱9,798,759.38

Progress

Reported complete (DPWH)

Start Date

May 6, 2021

Target End

August 18, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)CatanduanesCaramoranBocon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.