Roads24PK0037

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: PAVING OF UNPAVED ROADS - TERTIARY ROADS: LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0471+400 - K0472+054, LUBUAGAN, KALINGA

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: PAVING OF UNPAVED ROADS - TERTIARY ROADS: LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0471+400 - K0472+054, LUBUAGAN, KALINGA is a DPWH-tracked public work in Upper Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱26,639,387.01. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: MPD3 CONST. Figures trace to dpwh.

Upper Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱7,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24PK0037 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-08-10 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱40,733,008 per km= 1.0x the Cordillera Administrative Region median (n=103)

Contract cost ₱26,639,387 ÷ 0.654 km read from the DPWH title (“K0471+400 - K0472+054”; K-post / station range length). National percentile: 78. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: PAVING OF UNPAVED ROADS - TERTIARY ROADS: LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0471+400 - K0472+054, LUBUAGAN, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱7,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures, Saltan, Biyog Creek, Batong Buhay NHS, Mataliling Kiloy, Mabilong in Barangay Balbalasang, Barangay Balatoc, Barangay Upper Uma, Barangay Mabilong, Balbalan, Pasil and Lubuagan, Kalinga
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Upper Kalinga DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

12 projects · ₱130.8M total · 1 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS: TERTIARY ROADS - LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0459+(-260)-K0459+000, K0459+(-320)-K0459+(-287), K0459+(-350)-K0459+(-3

Upper Kalinga DEO, Cordillera Administrative Region

2024₱29.6M
Past target date (DPWH On-Going)
No sat.

REHABILITATION AND IMPROVEMENT OF THE PRESIDENTIAL SECURITY COMMAND HEADQUARTERS MANSION HOUSE DETACHMENT, THE MANSION HOUSE, ROMULO DRIVE, BRGY. LUALHATI, BAGUIO CITY

Cordillera Administrative Region, Cordillera Administrative Region

2024₱19.9M
Ongoing (DPWH-reported)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG

Upper Kalinga DEO, Cordillera Administrative Region

2025₱14.7M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (WEAVING CENTER), LUBUAGAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2024₱9.9M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (OPEN GYM) AT BNHS/SNHS, BARANGAY BANTAY AND BARANGAY SANTOR, TABUK CITY AND RIZAL, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2024₱5.9M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, LOWER UMA, LUBUAGAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2025₱5.9M
Past target date (DPWH On-Going)
View all 12 projects →

4. Implementation

Contract Amount

₱26,639,387.01

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

June 13, 2024

Target End

February 25, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: PAVING OF UNPAVED ROADS - TERTIARY ROADS: LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0471+400 - K0472+054, LUBUAGAN, KALINGA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/7c763627-621d-4c72-8c2c-730a1db4b5a4

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaLubuaganUma del Norte
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultLandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.