GAA 2017 MFO-117F00054

NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW-BACON-MANITO ROAD INCLUDING BRIDGE AND SLOPE PROTECTION, ROAD: K0595+514.35-K0596+763.35 (BANASI);K0599+370-K0599+780 (OSIAO);

NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW-BACON-MANITO ROAD INCLUDING BRIDGE AND SLOPE PROTECTION, ROAD: K0595+514.35-K0596+763.35 (BANASI);K0599+370-K0599+780 (OSIAO); is a DPWH-tracked public work in Region V, Region V. Reported contract value: ₱144,249,709.27. Status: Reported complete (DPWH). Contractor on record: 6RM CONST AND DEVT CORP FORMERLY R R MA 174. Figures trace to dpwh.

Region V, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17F00054 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-12-09 → 2025-04-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW-BACON-MANITO ROAD INCLUDING BRIDGE AND SLOPE PROTECTION, ROAD: K0595+514.35-K0596+763.35 (BANASI);K0599+370-K0599+780 (OSIAO);

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

17 projects · ₱1.2B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD, BONGA - PAMAMAS-AN LINOOBAN - MARARANGSI - CALUYAHAN, STA. 0+000 TO STA. 1+570, STA. 7+100 TO STA. 10+327.44, MOTIONG, SAMAR

Region VIII, Region VIII

2021₱207.2M
Reported complete (DPWH)
No sat.

MFO3-MAINT. & CONST. SERVICES OF OTHER INFRASTRUCTURES CONST./IMPR. OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, CONST OF CONCRETE ROAD-CAGRARAY CIRCUMFERENTIAL ROAD, TAMBILAGAO-LANGATON AND CABASAN-NAPAO-TANAGA SECTION, ALBAY 1ST LD

Region V, Region V

2017₱193.0M
Reported complete (DPWH)
No sat.

ROAD WIDENING SARANGANI-DAVAO DEL SUR COASTAL ROADK1658+783-K1663+311, K1664+630-K1666+908, ALABEL AND MALAPATAN, SARANGANI PROVINCE

Region XII, Region XII

2018₱188.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD, BRGY. IBOL - BRGY. JIAN-AN, BRGY. PANGDAN, JIABONG AND CATBALOGAN CITY, SAMAR

Region VIII, Region VIII

2021₱141.0M
Reported complete (DPWH)
No sat.

MFO1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, BACON-MANITO ROAD, BRIDGE COMPONENT, BACON, SORSOGON 1ST LD

Region V, Region V

2016₱107.2M
Reported complete (DPWH)
No sat.

CONST./IMPRVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD FROM BRGY. POLANGI-BRGY. PANAYURAN-BRGY. LITERON LEADING TO LULUGAYAN FALLS, CALBIGA RIVER & LANGUN-GOBINGOB CAVE, CALBIGA, SAMAR 2ND LD

Region VIII, Region VIII

2017₱92.4M
Reported complete (DPWH)
View all 17 projects →

4. Implementation

Contract Amount

₱144,249,709.27

Progress

Reported complete (DPWH)

Start Date

August 7, 2017

Target End

December 15, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonCity of SorsogonOsiao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.