Water Provision and Storage23CA0073

CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - IMPROVEMENT/REHABILITATION OF SOLAR WATER SYSTEM IN BARANGAY PALILI, SAMAL, BATAAN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - IMPROVEMENT/REHABILITATION OF SOLAR WATER SYSTEM IN BARANGAY PALILI, SAMAL, BATAAN is a DPWH-tracked public work in Bataan 1st DEO, Region III. Reported contract value: ₱9,799,997.64. Status: Reported complete (DPWH). Contractor on record: AS MACHA CONST AND TRADING. Figures trace to dpwh.

Bataan 1st DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23CA0073 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-08-28 → 2017-08-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS -  IMPROVEMENT/REHABILITATION OF SOLAR WATER SYSTEM IN BARANGAY PALILI, SAMAL, BATAAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project in Barangay Laon, Abucay, Bataan
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Bataan 1st DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

129 projects · ₱905.9M total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG COLO RIVER (MAGUINDONG DAM SECTION), BRGY LUACAN, DINALUPIHAN, BATAAN

Bataan 3rd DEO, Region III

2025₱51.9M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NEW ROAD, CURING AVE. CONNECTING JCT. LAYAC-BALANGA-MARIVELES PORT RD AND ROMAN EXPRESSWAY, ORANI

Bataan 1st DEO, Region III

2024₱29.7M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG PENTOR-BALSIK-CAULAMAN RIVER, SAN SIMON SECTION, PHASE ERD- 1, DINALUPIHAN, BATAAN

Bataan 1st DEO, Region III

2022₱24.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONST OF ROAD, PABITON ST., BRGY GUGO,

Bataan 1st DEO, Region III

2025₱24.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE ANS SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER RA 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN RD - DINALUPIHA, BATAAN

Bataan 3rd DEO, Region III

2025₱23.2M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF BARANGAY BALUT-PUKSUAN ROAD, ORANI, BATAAN

Bataan 1st DEO, Region III

2024₱19.8M
Reported complete (DPWH)
View all 129 projects →

4. Implementation

Contract Amount

₱9,799,997.64

Progress

Reported complete (DPWH)

Start Date

October 5, 2023

Target End

April 7, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BataanSamalPalili
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.