Roads22C00073

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, PROVINCE OF AURORA

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, PROVINCE OF AURORA is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱192,997,263.82. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: CAVACON CORP FORMERLY CAGAYAN VALLEY CONST. Figures trace to dpwh.

Region III, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱189,697,262 · CAVACON .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-07-19 → 2015-07-19

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, PROVINCE OF AURORA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2022 GAA. DBM GAA FY2022

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22C00073

₱189,697,262.16 · CAVACON .

Contractor

C

56 projects · ₱4.2B total · 0 flags

4. Implementation

Contract Amount

₱192,997,263.82

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

July 25, 2022

Target End

January 12, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, PROVINCE OF AURORA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/816b86bc-8238-4943-a631-8e4ef2578ef5

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)AuroraDingalanIbona
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.