Buildings and Facilities16CD0037

CONSTRUCTION OF SCHOOL BUILDING,BAYBAY ELEMENTARY SCHOOL,BAYBAY ANGAT 3RD LD

CONSTRUCTION OF SCHOOL BUILDING,BAYBAY ELEMENTARY SCHOOL,BAYBAY ANGAT 3RD LD is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱1,653,143.75. Status: Reported complete (DPWH). Contractor on record: 747 BUILDERS. Figures trace to dpwh.

Bulacan 2nd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱48,900 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-16-0036678 · ₱105,000 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16CD0037 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-17 → 2025-03-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SCHOOL BUILDING,BAYBAY ELEMENTARY SCHOOL,BAYBAY ANGAT 3RD LD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱48,900,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures Bulo River Phase I, San Miguel, Bulacan 3rd LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-16-0036678

₱105,000.00 · FY2016

Released to Bug-ang National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

125 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY STA.CLARA

Cavite 1st DEO, Region IV-A

2023₱28.9M
Reported complete (DPWH)
No sat.

CONCRETING OF BARANGAY PARADISE III FMR, BARANGAY PARADISE III, SAN JOSE DEL MONTE CITY, BULACAN

Bulacan 2nd DEO, Region III

2023₱24.9M
Reported complete (DPWH)
No sat.

LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMLOCAL ROADS AND BRIDGESLOCAL ROADSASPHALT OVERLAY, ARNALDO HIGHWAY, BARANGAY SAN FRANCISCO, GENERAL TRIAS CITY, CAVITE

Cavite 1st DEO, Region IV-A

2021₱24.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS-2ND STREET (FROM BONIFACIO DRIVE TO BASECO AREA)

South Manila DEO, National Capital Region

2024₱24.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, KAWIT-NOVELETA DIVERSION RD. - K0022+(-364) - K0022+(-299), K0022+(-224) - K0022+(-167), K0022+(-167) - K0022+(-106), K0022

Cavite 1st DEO, Region IV-A

2020₱23.0M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES - CONSTRUCTION OF GREGORIO LUNA BRIDGE AT LIGTONG 4, ROSARIO, CAVITE

Cavite 1st DEO, Region IV-A

2019₱22.8M
Reported complete (DPWH)
View all 125 projects →

4. Implementation

Contract Amount

₱1,653,143.75

Progress

Reported complete (DPWH)

Start Date

March 29, 2016

Target End

May 27, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanAngatBaybay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.