Buildings and Facilities19FK0043

REHABILITATION/MAJOR REPAIR OF DPWH SORSOGON 1ST DISTRICT ENGINEERING OFFICE, SORSOGON CITY

REHABILITATION/MAJOR REPAIR OF DPWH SORSOGON 1ST DISTRICT ENGINEERING OFFICE, SORSOGON CITY is a DPWH-tracked public work in Sorsogon DEO, Region V. Reported contract value: ₱3,526,954.33. Status: Reported complete (DPWH). Contractor on record: HKP CONST AND SUPPLY. Figures trace to dpwh.

Sorsogon DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROVII-19-0014302 · ₱433,364 · release to the district office, not itemized per project

    Possible match · score 0.72

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19FK0043 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-05 → 2025-04-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/MAJOR REPAIR OF DPWH SORSOGON 1ST DISTRICT ENGINEERING OFFICE, SORSOGON CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROVII-19-0014302

₱433,364.00 · FY2019

Released to Capital Region Eduardo T. Oporto Memorial National (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

116 projects · ₱2.6B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOM 1: ENSURE SAFE AND RELIABLE NATIONAL RAOD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINK/NEW ROADS - MALUBI - CABANGCALAN - DAYHAGAN - TINIGBAN - MATABA ROAD, PACKAGE 1, MASBATE

Masbate 2nd DEO, Region V

2024₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINK/NEW ROADS - ASID TIGBAO - BARA - MALBUG ROAD, PACKAGE 1, MASBATE

Masbate 2nd DEO, Region V

2024₱96.5M
Reported complete (DPWH)
No sat.

LOCALLY-FUNDED PROJECTS - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH MASBATE 2ND DEO BUILDING (PHASE V), MASBATE, CITY OF MASBATE, MASBATE

Masbate 2nd DEO, Region V

2025₱95.0M
Past target date (DPWH On-Going)
No sat.

OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- MASBATE- CATAINGAN- PLACER RD- K0084+735- K0085+799, K0088+830- K0089+000, K0073+565- K0074+220

Masbate 3rd DEO, Region V

2025₱91.7M
Past target date (DPWH On-Going)
No sat.

OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- MASBATE- CATAINGAN- PLACER RD- K0057+500- K0059+114

Masbate 3rd DEO, Region V

2025₱76.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG MASBATE - CATAINGAN - PLACER RD (S00005MT) K0006+060 - K0007+141, K00

Masbate 2nd DEO, Region V

2024₱73.3M
Reported complete (100% progress, DPWH status On-Going)
View all 116 projects →

4. Implementation

Contract Amount

₱3,526,954.33

Progress

Reported complete (DPWH)

Start Date

August 7, 2019

Target End

October 5, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonCity of SorsogonGuinlajon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.