Water Provision and Storage20LF0048

CLUSTER X - CONSTRUCTION (COMPLETION) OF WATER SYSTEM LEVEL II, DISTRICT 1, DAVAO ORIENTAL 1. CONSTRUCTION(COMPLETION) OF WATER SYSTEM LEVEL II, BRGY. SAN ANTONIO, CARAGA, DAVAO ORIENTAL 2. CONSTRUCTION(COMPLETION) OF WATER SYSTEM LEVEL II, BRGY. DADONG,

CLUSTER X - CONSTRUCTION (COMPLETION) OF WATER SYSTEM LEVEL II, DISTRICT 1, DAVAO ORIENTAL 1. CONSTRUCTION(COMPLETION) OF WATER SYSTEM LEVEL II, BRGY. SAN ANTONIO, CARAGA, DAVAO ORIENTAL 2. CONSTRUCTION(COMPLETION) OF WATER SYSTEM LEVEL II, BRGY. DADONG, is a DPWH-tracked public work in Davao Oriental 1st DEO, Region XI. Reported contract value: ₱1,699,999.64. Status: Reported complete (DPWH). Contractor on record: PHSMB CONST AND SUPPLY. Figures trace to dpwh.

Davao Oriental 1st DEO, Region XI
Region: Region XI

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱13,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20LF0048 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-05-25 → 2025-10-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER X - CONSTRUCTION (COMPLETION) OF WATER SYSTEM LEVEL II, DISTRICT 1, DAVAO ORIENTAL 1. CONSTRUCTION(COMPLETION) OF WATER SYSTEM LEVEL II, BRGY. SAN ANTONIO, CARAGA, DAVAO ORIENTAL 2. CONSTRUCTION(COMPLETION) OF WATER SYSTEM LEVEL II, BRGY. DADONG,

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱13,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure at San Isidro Elementary School, Brgy. San Antonio, Cateel, Davao Oriental
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Davao Oriental 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

4. Implementation

Contract Amount

₱1,699,999.64

Progress

Reported complete (DPWH)

Start Date

February 26, 2020

Target End

April 25, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao OrientalCaragaSan Antonio
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.