GAA 2017 MFO-217GA0030No coordinates published by DPWH

CONST. OF RIVER CTRL.(REV. WALL)ALONG AKLAN RIVER INCL. OTHER STRUCTURES/FACILITIES PHASEII,DAJA SUR

CONST. OF RIVER CTRL.(REV. WALL)ALONG AKLAN RIVER INCL. OTHER STRUCTURES/FACILITIES PHASEII,DAJA SUR is a DPWH-tracked public work in Aklan DEO, Region VI. Reported contract value: ₱34,299,777.54. Status: Reported complete (DPWH). Contractor on record: PHILWORKS CONST. Figures trace to dpwh.

Aklan DEO, Region VI

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region VI

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0013118 · ₱318,930 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱32,750,875 · PHILWORKS CONSTRUCTION AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF RIVER CTRL.(REV. WALL)ALONG AKLAN RIVER INCL. OTHER STRUCTURES/FACILITIES PHASEII,DAJA SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0013118

₱318,930.00 · FY2017

Released to Sulat National High S School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

17GA0030 - Construction of River Control

₱32,750,875.11 · PHILWORKS CONSTRUCTION AND SUPPLY

Award / contract ref: 17GA0030

Contractor

D

81 projects · ₱6.4B total · 0 flags

Other projects by this contractor

CONSTRUCTION/IMPROVEMENT/UPGRADING OF FLOOD CONTROL ALONG SAN FRANCISCO RIVER, POLANGUI-OAS, ALBAY, POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICT

Region V, Region V

2018₱281.5M
Reported complete (DPWH)

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, UPSTREAM OF PONSO STEEL BR

Region V, Region V

2023₱280.3M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-PILI DIVERSION ROAD-K0450+(-348)-K0450+(-122), K0450+(-099)-K0450+772.30, K04

Region V, Region V

2024₱203.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-MABOLO-ALMEDA BYPASS RD (PACKAGE 1), CAMARINES SUR, CAMARINES SUR (3RD LEGISLATIVE DISTRICT)

Region V, Region V

2023₱193.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, DOWNSTREAM OF PONSO STEEL

Region V, Region V

2023₱187.0M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM -CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-MABOLO - ALMEDA BYPASS RD. (PACKAGE 2), CAMARINES SUR, NAGA CITY, CAMARINES SUR 3RD LEGISLATIVE DISTRICT

Region V, Region V

2023₱186.8M
Past target date (DPWH On-Going)
View all 81 projects →

4. Implementation

Contract Amount

₱34,299,777.54

Progress

Reported complete (DPWH)

Start Date

May 8, 2017

Target End

December 18, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)Aklan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.