Roads16PK0010No coordinates published by DPWH

CONCRETING OF BALINCIAGAO NORTE FARM TO MARKET ROAD BRGY. BALINCIAGAO NORTE,PASIL,KALINGA

CONCRETING OF BALINCIAGAO NORTE FARM TO MARKET ROAD BRGY. BALINCIAGAO NORTE,PASIL,KALINGA is a DPWH-tracked public work in Upper Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱2,356,269.06. Status: Reported complete (DPWH). Contractor on record: MGSR CONST. Figures trace to dpwh.

Upper Kalinga DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Cordillera Administrative Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROVIII-16-0004567 · ₱528,000 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16PK0010 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BALINCIAGAO NORTE FARM TO MARKET ROAD BRGY. BALINCIAGAO NORTE,PASIL,KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-16-0004567

₱528,000.00 · FY2016

Released to Hinabangan National High School (Rawis NHS) PS req (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

48 projects · ₱549.6M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - MANUEL S. AGYAO BOULEVARD - K0507 + 360-K0510 + 075

Lower Kalinga DEO, Cordillera Administrative Region

2024₱63.7M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS ALONG KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION), K0496+-593 - K0496+-027, K0496+523-K0497+134, K0513+800-K0514+549

Lower Kalinga DEO, Cordillera Administrative Region

2020₱62.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS - KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION) - K0500+474 - K0501+753

Lower Kalinga DEO, Cordillera Administrative Region

2023₱62.2M
Reported complete (100% progress, DPWH status On-Going)
No sat.

LOCAL PROGRAM (LP) - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF DPWH LOWER KALINGA DEO BUILDING, TABUK, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2024₱49.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF 3STY15CL, MACUTAY PALAO NATIONAL HIGH SCHOOL, RIZAL, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2023₱48.7M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFETY AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS - KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION) - K0520+026 - K0521+000, K0524+128 - K0525+096

Lower Kalinga DEO, Cordillera Administrative Region

2022₱46.7M
Reported complete (DPWH)
View all 48 projects →

4. Implementation

Contract Amount

₱2,356,269.06

Progress

Reported complete (DPWH)

Start Date

January 23, 2017

Target End

February 28, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.