Roads23PL0001

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS - KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION) - K0500+474 - K0501+753

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS - KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION) - K0500+474 - K0501+753 is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱62,180,471.81. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: MGSR CONST. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱6,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23PL0001 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-02-05 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS - KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION) - K0500+474 - K0501+753

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱6,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Barangays Ga-ang, Se-et, Pangol, Anggacan (Botobot) and Mabaca, Tanudan, Kalinga
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Lower Kalinga DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

48 projects · ₱549.6M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - MANUEL S. AGYAO BOULEVARD - K0507 + 360-K0510 + 075

Lower Kalinga DEO, Cordillera Administrative Region

2024₱63.7M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS ALONG KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION), K0496+-593 - K0496+-027, K0496+523-K0497+134, K0513+800-K0514+549

Lower Kalinga DEO, Cordillera Administrative Region

2020₱62.6M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM (LP) - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF DPWH LOWER KALINGA DEO BUILDING, TABUK, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2024₱49.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF 3STY15CL, MACUTAY PALAO NATIONAL HIGH SCHOOL, RIZAL, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2023₱48.7M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFETY AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS - KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION) - K0520+026 - K0521+000, K0524+128 - K0525+096

Lower Kalinga DEO, Cordillera Administrative Region

2022₱46.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ONE(1) STOREY - EIGHT(8) UNIT WORKSHOP SCHOOL WITH ATTACHED CR, TANUDAN VOCATIONAL SCHOOL, TANUDAN, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2018₱35.1M
Reported complete (DPWH)
View all 48 projects →

4. Implementation

Contract Amount

₱62,180,471.81

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

February 20, 2023

Target End

January 28, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaCity of TabukBulanao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.