Bridges25AE0005

CONSTRUCTION OF NEW BRIDGES - SAN PABLO BR. ALONG MANILA NORTH RD.

CONSTRUCTION OF NEW BRIDGES - SAN PABLO BR. ALONG MANILA NORTH RD. is a DPWH-tracked public work in La Union 1st DEO, Region I. Reported contract value: ₱28,336,323.77. Status: Past target date (DPWH On-Going). Contractor on record: RAPHAEIL CONST. Figures trace to dpwh.

La Union 1st DEO, Region I
Region: Region I

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25AE0005 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    63% reported · imagery 2023-04-12 → 2025-02-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF NEW BRIDGES - SAN PABLO BR. ALONG MANILA NORTH RD.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Brgy. Napaset, Luna, La Union
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

La Union 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

62 projects · ₱547.7M total · 0 flags

Other projects by this contractor

No sat.

CONST/ IMPRV'TOFACCESS RDS LEADING TO DECLAREDTOURISMDESTINATIONS-ACCESS RD LEADINGTOMUNICIPALTREE PARK& ALLPAVILLION&RETREATCENTER(POBLACION),SASABA RICETERRACES,BIMMULALAKAW&PIMMALANGKA WATERFALLS,GONGO(NATIVETOMB)&AMBURAYAN RIVER,BRGY.CORROOY,SANTOL,LU

La Union 1st DEO, Region I

2021₱28.9M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF ROAD, BARANGAY NAGSABARAN, BALAOAN, LA UNION

La Union 1st DEO, Region I

2024₱21.6M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - BACNOTAN - LUNA - BALAOAN RD - K0293+320 - K0293+600

La Union 1st DEO, Region I

2024₱19.9M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BLDG. (EXECUTIVE BUILDING) PHASE 2, CITY OF SAN FERNANDO, LA UNION

La Union 1st DEO, Region I

2023₱19.8M
Reported complete (DPWH)
No sat.

CONST/IMPRV'T OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS RD LEADING TO MUNICIPALTREEPARK& ALLPAVILLION& RETREATCENTER (POB),SASABARICETERRACES, BIMMULALAKAW&PIMMALANGKA WATERFALLS,GONGO (NATIVETOMB)&AMBURAYANRIVER,BRGY.CORROOY,SANTOL,LU

La Union 1st DEO, Region I

2019₱19.6M
Reported complete (DPWH)
No sat.

CONST/IMPRV'T OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS(TRIP)-ACCESS RD LEADING TO MUNICIPAL TREE PARK&PAVILLION&RETREATCENTER (POB.)SASABA TERRACES,BIMMULALAKAW&PIMMALANGKA WATERFALLS,GONGO(NATIVE TOMB)&AMBURAYAN RIVER,BRGY.CORROOY,SANTOL,LU

La Union 1st DEO, Region I

2022₱19.6M
Reported complete (DPWH)
View all 62 projects →

4. Implementation

Contract Amount

₱28,336,323.77

Progress

Past target date (DPWH On-Going)

Start Date

March 20, 2025

Target End

December 5, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)La UnionBalaoanSan Pablo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.