RAPHAEIL CONST is listed as a company organization in Philippine public procurement records on this site, with 62 linked DPWH project(s) totaling about ₱547,700,345.91. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
RAPHAEIL CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 62
- Total value
- ₱547,700,345.91
- Published flags
- 0
- Region
- La Union 1st DEO · Region I
Licensed officers (PCAB)
- Nelson Ormita Libao · Authorized Managing Officer (PCAB license 34801) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for RAPHAEIL CONST — not an accusation or finding of wrongdoing.
Score: 83.80 / 100 · Projects in sample: 62 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 73.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 73.6
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 49
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 62
- pastTargetOngoingProjects
- 8
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 62
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 62
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 62
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 62
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 62 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONST/ IMPRV'TOFACCESS RDS LEADING TO DECLAREDTOURISMDESTINATIONS-ACCESS RD LEADINGTOMUNICIPALTREE PARK& ALLPAVILLION&RETREATCENTER(POBLACION),SASABA RICETERRACES,BIMMULALAKAW&PIMMALANGKA WATERFALLS,GONGO(NATIVETOMB)&AMBURAYAN RIVER,BRGY.CORROOY,SANTOL,LU21AE0014 · ₱28,922,559.41 · mapped
- CONSTRUCTION OF NEW BRIDGES - SAN PABLO BR. ALONG MANILA NORTH RD.25AE0005 · ₱28,336,323.77 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF ROAD, BARANGAY NAGSABARAN, BALAOAN, LA UNION24AE0073 · ₱21,559,567.80 · mapped
- CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - BACNOTAN - LUNA - BALAOAN RD - K0293+320 - K0293+60024AE0011 · ₱19,893,013.42 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BLDG. (EXECUTIVE BUILDING) PHASE 2, CITY OF SAN FERNANDO, LA UNION23AE0068 · ₱19,799,112.00 · mapped
- CONST/IMPRV'T OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS RD LEADING TO MUNICIPALTREEPARK& ALLPAVILLION& RETREATCENTER (POB),SASABARICETERRACES, BIMMULALAKAW&PIMMALANGKA WATERFALLS,GONGO (NATIVETOMB)&AMBURAYANRIVER,BRGY.CORROOY,SANTOL,LU19AE0024 · ₱19,600,000.00 · mapped
- CONST/IMPRV'T OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS(TRIP)-ACCESS RD LEADING TO MUNICIPAL TREE PARK&PAVILLION&RETREATCENTER (POB.)SASABA TERRACES,BIMMULALAKAW&PIMMALANGKA WATERFALLS,GONGO(NATIVE TOMB)&AMBURAYAN RIVER,BRGY.CORROOY,SANTOL,LU22AE0024 · ₱19,599,819.17 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING (TEEN CENTER), SAN FERNANDO CITY, LA UNION25AE0059 · ₱19,206,677.73 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT - BACNOTAN - LUNA - BALOAN RD - K0297+000 - K0298+87620AE0019 · ₱18,884,853.49 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, SANTOL, LA UNION20AE0033 · ₱18,639,091.87 · mapped
- CONST'N. OF TWO(2)STOREY-EIGHT(8) CLASSROOM SCHOOL BUILDING AT LONGOS E/S, SAN FABIAN, PANGASINAN19AH0230 · ₱17,820,000.00 · mapped
- CONCRETING OF BRGY. CASIAMAN TO BRGY. AROSIP FMR, BRGY. CASIAMAN, BACNOTAN, LA UNION24AE0097 · ₱14,924,744.28 · mapped
- CONCRETING OF SIITO MATAGEKTEK-SITIO BANAWA, BRGY. LACONG FMR, BRGY. LACONG, SAN GABRIEL, LA UNION24AE0093 · ₱14,923,672.32 · mapped
- CONCRETING OF SITIO SASAIG, BRGY. DAKING FMR, BRGY. DAKING, SAN GABRIEL, LA UNION25AE0067 · ₱14,335,928.22 · mapped
- CONST/IMPV'TOFACCESSRDSLEADINGTODECLARED TOURISM DESTINATIONS-ACCESSRDSLEADINGTO MUNICIPALTREEPARK&ALL PAVILION&RETREAT CENTER(POB.)SASABARICE TERRACES,BIMMULALAKAW&PIMMALANGKA WATERFALLS,GONGO(NATIVE TOMB)&AMBURAYAN RIVER CONTROL,BRGY.CORROOY,SANTOL,LU20AE0002 · ₱14,036,717.93 · mapped
- CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING AT CORROOY ELEMENTARY SCHOOL, SANTOL, LA UNION20AE0069 · ₱11,980,909.42 · mapped
- REPAIR/ REHABILITATION/ IMPROVEMENT OF PUDOC - EAST FLOOD CONTROL AND DRAINAGE STRUCTURES, BRGY. PUDOC - EAST BANGAR18AE0115 · ₱11,580,000.00 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - LUNA - BANGAR RD - K0307+722 - K0307+96321AE0065 · ₱10,846,098.80 · mapped
- CONCRETING OF BANTUAGE, BRGY. LACONG TO KAPTAAWAN SECTION, BRGY. LIPAY SUR FMR, BRGY. LACONG AND BRGY. LIPAY SUR, SAN GABRIEL, LA UNION24AE0095 · ₱9,948,800.50 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - REHABILITATION OF BARANGAY ROAD, BARANGAY RISSING, BANGAR, LA UNION21AE0058 · ₱9,899,279.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY LINGSAT, SAN FERNANDO, LA UNION24AE0081 · ₱9,898,472.82 · mapped
- CONSTRUCTION OF 2 STOREY 4 CLASSROOM SCHOOL BUILDING AT SANTOL CENTRAL SCHOOL, SANTOL, LA UNION19AE0085 · ₱9,797,648.00 · mapped
- CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS/ WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, CITY OF SAN FERNANDO, LA UNION23AE0066 · ₱9,795,000.00 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - LUNA - BANGAR RD - K0304+603 - K0305+00022AE0002 · ₱9,793,464.80 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FERNANDO AIRPORT RD - K0265+(-018) - K0266+03323AE0001 · ₱9,785,747.81 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, SUDIPEN, LA UNION25AE0024 · ₱9,652,491.98 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BRGY. NAPASET, LUNA, LA UNION25AE0044 · ₱9,536,181.90 · mapped
- REHAB/MAJOR REPAIR OF PERMANENT BRIDGE ALONG BACNOTAN-LUNA-BALAOAN ROAD, NAGREBCAN BRIDGE16AE0036 · ₱9,500,739.57 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) RISSING TO PARATONG NO.4 ROAD LEADING TO PARATONG DISTRICT BEACH, BANGAR, LA UNION25AE0013 · ₱9,475,668.29 · mapped
- CONSTRUCTION OF 2 STOREY 4 CLASSROOM SCHOOL BUILDING AT BAY-O INTEGRATED SCHOOL, SANTOL, LA UNION18AE0098 · ₱9,301,723.46 · mapped
- CONSTRUCTION OF 2 STOREY 4 CLASSROOM SCHOOL BUILDING AT SANTOL VOCATIONAL HIGH SCHOOL - LIGUAY ANNEX, SANTOL, LA UNION (RE-ADVERTISEMENT)18AE0097 · ₱9,161,435.65 · mapped
- CONSTRUCTION OF GUILONG FMR, BRGY. CORROOY, SANTOL, LA UNION22AE0080 · ₱5,968,995.20 · mapped
- CONCRETING OF BRGY. LETTAC NORTE - BRGY. LETTAC SUR FMR PHASE II, BRGY. LETTAC NORTE AND BRGY. LETTAC SUR, SANTOL, LA UNION19AE0093 · ₱4,974,483.25 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - REHABILITATION OF ROAD, BARANGAY NAMTUTAN, CITY OF SAN FERNANDO, LA UNION22AE0036 · ₱4,950,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - REHABILITATION OF LETTAC NORTE ROAD, INCLUDING SLOPE PROTECTION WORKS, SANTOL, LA UNION21AE0051 · ₱4,949,670.34 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD, BRGY. IPET, SUDIPEN, LA UNION23AE0060 · ₱4,949,425.38 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - REHABILITATION OF MULTI-PURPOSE BUILDING, DMMMSU-OUS, BARANGAY CATBANGEN, CITY OF SAN FERNANDO, LA UNION24AE0044 · ₱4,949,255.79 · mapped
- Construction of Flood Mitigating Structure, Purok 5, Namtutan, City of San Fernando, La Union23AE0039 · ₱4,899,991.63 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, SANTOL, LA UNION18AE0037 · ₱4,808,870.33 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SIGNAGE AND PAVEMENT MARKINGS ALONG JUNCTION ALONG SN FERNANDO - BAGULIN RD - K270+(-500), BARANGAY TANQUI, SAN FERNANDO CITY, LA UNION24AE0029 · ₱4,477,077.03 · mapped
- CONSTRUCTION OF 1 STOREY 2 CLASSROOM SCHOOL BUILDING AT SANTOL VOCATIONAL HIGH SCHOOL - LIGUAY ANNEX, SANTOL, LA UNION19AE0089 · ₱4,099,725.12 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - COMPLETION OF MULTI-PURPOSE BUILDING, (ZARAGOSA ELEMENTARY SCHOOL), BARANGAY ZARAGOSA, BACNOTAN, LA UNION25AE0057 · ₱3,861,178.00 · mapped
- CONSTRUCTION (COMPLETION) OF 4 STOREY TECHVOC WORKSHOP BUILDING/ LABORATORIES FOR SENIOR HIGH SCHOOL AT SANTOL VOCATIONAL HIGH SCHOOL, SANTOL, LA UNION21AE0085 · ₱3,499,250.00 · mapped
- REPAIR/ REHABILITATION/ IMPROVEMENT OF AMBURAYAN RIVER CONTROL, BRGY. MA. CRISTINA, BANGAR, LA UNION18AE0113 · ₱3,411,410.44 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION (COMPLETION) OF EVACUATION CENTER, BRGY. CENTRAL EAST 2, BANGAR, LA UNION21AE0020 · ₱2,970,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM, IMPROVEMENT OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, SANTOL, LA UNION19AE0077 · ₱2,970,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT), BRGY. PAAGAN, SANTOL, LA UNION21AE0031 · ₱2,969,923.90 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY ZARAGOSA, BACNOTAN, LA UNION25AE0025 · ₱2,895,637.70 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. SALCEDO, LUNA, LA UNION (RE-ADVERTISEMENT 2)18AE0043 · ₱2,887,784.62 · mapped
- LOCAL INFRASTRUCTURE PROGRAM, COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. SAN BLAS, BANGAR, LA UNION19AE0076 · ₱2,883,585.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 34801
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jan 11, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 34801); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
11 evaluations listed across 6 GPPB CPES releases; average final rating 89.6% over 7 rated projects; 10 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 4, 2026 | BCDA | ₱45,742,015.00 | On-going | 95.3% | — | 41st, p. 16 |
| Feb 2, 2026 | NIA | ₱4,734,789.00 | Completed | 88.7% | 88.7% | 41st, p. 16 |
| Feb 2, 2026 | NIA | ₱4,733,510.00 | Completed | 88.0% | 88.0% | 41st, p. 16 |
| Jul 21, 2025 | DPWH | ₱28,336,323.00 | On-going | 95.2% | — | 40th, p. 256 |
| Jul 1, 2025 | DPWH | ₱9,475,668.00 | Completed | 92.8% | 94.7% | 40th, p. 256 |
| Feb 10, 2025 | DPWH | ₱9,898,473.00 | Completed | 99.4% | 98.3% | 39th (rev), p. 175 |
| Oct 14, 2024 | DPWH | ₱9,898,472.00 | On-going | 97.8% | — | 40th, p. 256 |
| Oct 7, 2024 | NIA | ₱5,237,046.00 | Completed | 87.8% | 87.8% | 38th, p. 200 |
| Oct 7, 2024 | NIA | ₱4,734,947.00 | Completed | 82.2% | 82.2% | 38th, p. 200 |
| Mar 18, 2023 | DPWH | ₱19,599,819.00 | Completed | 92.5% | 87.2% | 35th, p. 142 |
| Apr 6, 2021 | DPWH 07/12/2022 DPWH 18,822.066 O 0.345 0.300 0.092 0.022 0.045 0.033 83.70% - On-Going | ₱10,846,099.00 | Completed | — | — | 34th, p. 71 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →