Buildings and Facilities21KD0029

CONSTRUCTION OF MULTI PURPOSE BUILDING BARANGAY TABLON, CAGAYAN DE ORO CITY

CONSTRUCTION OF MULTI PURPOSE BUILDING BARANGAY TABLON, CAGAYAN DE ORO CITY is a DPWH-tracked public work in Cagayan de Oro City 2nd DEO, Region X. Reported contract value: ₱4,702,119.57. Status: Reported complete (DPWH). Contractor on record: A M SALONG CONST. Figures trace to dpwh.

Cagayan de Oro City 2nd DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱30,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21KD0029 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-09 → 2020-03-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI PURPOSE BUILDING  BARANGAY TABLON, CAGAYAN DE ORO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Umalag River, Barangay Tablon, Cagayan de Oro City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Cagayan de Oro City 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

44 projects · ₱896.7M total · 3 flags

4. Implementation

Contract Amount

₱4,702,119.57

Progress

Reported complete (DPWH)

Start Date

March 18, 2021

Target End

May 31, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF MULTI PURPOSE BUILDING BARANGAY TABLON, CAGAYAN DE ORO CITY.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/88db036e-70af-4776-a7e3-f78136b86a80

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)City of Cagayan De OroTablon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.