Buildings and Facilities19DD0496

CONSTRUCTION OF 4STY8CL, SEN. CLARO M. RECTO MEMORIAL INTEGRATED SCHOOL, LIPA CITY, BATANGAS

CONSTRUCTION OF 4STY8CL, SEN. CLARO M. RECTO MEMORIAL INTEGRATED SCHOOL, LIPA CITY, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱23,342,080.00. Status: Reported complete (DPWH). Contractor on record: RUSMEN BUILDERS. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROVI-19-0014483 · ₱60,000 · release to the district office, not itemized per project

    Possible match · score 0.80

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19DD0496 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-28 → 2025-08-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 4STY8CL, SEN. CLARO M. RECTO MEMORIAL INTEGRATED SCHOOL, LIPA CITY, BATANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-19-0014483

₱60,000.00 · FY2019

Released to Bata National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

107 projects · ₱3.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), MUNICIPALITY OF SAN PASCUAL, BATANGAS (PHASE 2)

Batangas 2nd DEO, Region IV-A

2023₱148.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, ASPHALT OVERLAY WITH CORRECTION 100 MM BATANGAS - QUEZON RD K0134-898 - K0136+465, K0136+497 - K0136+909

Batangas 2nd DEO, Region IV-A

2024₱144.8M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BATANGAS CITY-SAN PASCUAL-BAUAN DIVERSION ROAD, PACKAGE L, BATANGAS

Batangas 2nd DEO, Region IV-A

2023₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - PRIMARY ROADS, MANILA-BATANGAS RD - K0073 + 500 - K0076 +000

Batangas 4th DEO, Region IV-A

2023₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, BAUAN-MABINI RD K0146+(-072) - K0146+726, K0146+965 - K0147+139

Batangas 2nd DEO, Region IV-A

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, LIPA-BALETE RD - K0077 + 094 - K0078 + 659, K0079 + 940 - K0081 + 240

Batangas 4th DEO, Region IV-A

2024₱84.2M
Past target date (DPWH On-Going)
View all 107 projects →

4. Implementation

Contract Amount

₱23,342,080.00

Progress

Reported complete (DPWH)

Start Date

September 20, 2019

Target End

March 17, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF 4STY8CL, SEN. CLARO M. RECTO MEMORIAL INTEGRATED SCHOOL, LIPA CITY, BATANGAS.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/8af98a56-06a8-4689-a1c9-b000f95f9a49

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)BatangasCity of LipaPoblacion Barangay 7
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.