Flood Control and Drainage19LE0076

CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), BITON FLOOD CONTROL, DON MARCELINO, DAVAO OCCIDENTAL STA.0+040 - STA.0+190 (BOTH SIDES)

CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), BITON FLOOD CONTROL, DON MARCELINO, DAVAO OCCIDENTAL STA.0+040 - STA.0+190 (BOTH SIDES) is a DPWH-tracked public work in Davao Occidental DEO, Region XI. Reported contract value: ₱14,612,931.75. Status: Reported complete (DPWH). Contractor on record: MM MASULOT CONST CORP. Figures trace to dpwh.

Davao Occidental DEO, Region XI
Region: Region XI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-E-19-0003090 · ₱180,662 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱14,612,932 · MASULOT CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-20 → 2025-10-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (revetment)

₱97,420 per linear m= 0.7x the Region XI median (n=93)

Contract cost ₱14,612,932 ÷ 150 linear m read from the DPWH title (“STA.0+040 - STA.0+190”; station range length (Sta. a+b to c+d)). National percentile: 33. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Davao Occidental

Based on the coordinates published with the DPWH record and NOAH file DavaoOccidental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), BITON FLOOD CONTROL, DON MARCELINO, DAVAO OCCIDENTAL STA.0+040 - STA.0+190 (BOTH SIDES)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-19-0003090

₱180,662.00 · FY2019

Released to Regional Field Unit - II (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

19LE0076

₱14,612,931.75 · MASULOT CONSTRUCTION

Award / contract ref: 19LE0076

Contractor

A

59 projects · ₱1.8B total · 0 flags

4. Implementation

Contract Amount

₱14,612,931.75

Progress

Reported complete (DPWH)

Start Date

June 4, 2019

Target End

October 28, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), BITON FLOOD CONTROL, DON MARCELINO, DAVAO OCCIDENTAL STA.0+040 - STA.0+190 (BOTH SIDES).” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/8c076b5e-4328-4639-b291-c651c391a47f

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao OccidentalDon MarcelinoLawa
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.