Construction of Dike23FB0013

Construction of River Bank Protection Works and Drainage System along Barangay Lamba, Legazpi City, Albay

Construction of River Bank Protection Works and Drainage System along Barangay Lamba, Legazpi City, Albay is a DPWH-tracked public work in LEGAZPI CITY (CAPITAL) (ALBAY), ALBAY, Region V. Reported contract value: ₱57,898,479.61. Status: Reported complete (DPWH). Contractor on record: MUNTOPAR BUILDERS CORP. Figures trace to sumbong.

LEGAZPI CITY (CAPITAL) (ALBAY), ALBAY, Region V
Region: Region V

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱10,000

    Probable match · score 0.90

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱55,874,198 · MUNTOPAR BUILDERS CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-05-03 → 2025-10-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Albay

Based on the coordinates published with the DPWH record and NOAH file Albay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of River Bank Protection Works and Drainage System along Barangay Lamba, Legazpi City, Albay

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control and Drainage System in Regional Center Site, Rawis, Legazpi City, Albay
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Albay 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Drainage System along Barangay Lamba, Legazpi City

₱55,874,197.90 · MUNTOPAR BUILDERS CORP

Award / contract ref: 23FB0013

Contractor

C

172 projects · ₱9.6B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE(MVUC) AS PER R.A. 11239-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ)-K0275+000-K0276+024, K0276+510-K0277+000, K0283+000-K02

Region V, Region V

2024₱161.4M
Past target date (DPWH On-Going)
No sat.

CLUSTER X-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-X-I: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ)-K0601+240-K0602+000, K0605+414-K0606+42

Region V, Region V

2024₱153.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF SORSOGON 2ND DISTRICT HOSPITAL, PHASE 3, IROSIN, SORSOGON, BRGY. BUENAVISTA, IROSIN,

Sorsogon 2nd DEO, Region V

2024₱143.3M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY BALETE TO SIT

Sorsogon DEO, Region V

2025₱143.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF ROAD, BARANGAY SAN ANTONIO TO BARANGAY SAN RAFAEL, PRIETO DIAZ, SORSOGON PHASE 2, PR

Sorsogon 2nd DEO, Region V

2025₱142.6M
Past target date (DPWH On-Going)
No sat.

CONST OF MP BUILDING (COVERED COURT) AT BRGY. ROXAS, PADRE DIAZ, BRGY. PALALE, BULAN, BRGY. PAYAWIN,

Sorsogon 2nd DEO, Region V

2025₱142.1M
Past target date (DPWH On-Going)
View all 172 projects →

4. Implementation

Contract Amount

₱57,898,479.61

Progress

Reported complete (DPWH)

Start Date

February 27, 2023

Target End

September 3, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of LegazpiBgy. 60 - Lamba
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultFlood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.