BIP: CONSTRUCTION OF ROAD, INARADO - TAGOYTOY ROAD, DARAGA, ALBAY

BIP: CONSTRUCTION OF ROAD, INARADO - TAGOYTOY ROAD, DARAGA, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱59,398,295.00. Status: Past target date (DPWH On-Going). Contractor on record: WELEX CONST INC FORMERLY WELEX C. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱38,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱57,597,615 · WELEX CONSTRUCTION,

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    91% reported · imagery 2023-04-25 → 2023-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BIP: CONSTRUCTION OF ROAD, INARADO - TAGOYTOY ROAD, DARAGA, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱38,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Barangay Namantao, Daraga, Albay
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Albay 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Road, Inarado - Tagoytoy Road, Daraga, Albay

₱57,597,615.41 · WELEX CONSTRUCTION,

Award / contract ref: 24FB0008

Contractor

B

82 projects · ₱4.9B total · 1 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD, ZONE 6-ZONE 7, BULAN, SORSOGON, BULAN, SORSOGON (2ND

Region V, Region V

2024₱173.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF POBLACION NORTE-CENTRAL AND SUR COASTAL ROAD, BARCELONA, SORSOGON, BARCEL

Region V, Region V

2023₱173.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF PINONTINGAN-PANGANIBAN COASTAL ROAD, GUBAT, SORSOGON, GUBAT, SORSOGON(2ND

Region V, Region V

2023₱144.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ZONE 7-INARAN-NASUJE COASTAL ROAD WITH SHORE PROTECTION, BULAN, SORSOGON,

Region V, Region V

2023₱144.7M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, TERTIARY ROADS: JCT. PUTIAO-PILAR-DONSOL ROAD, SORSOGON 1ST LEGISLATIVE DISTRICT

Region V, Region V

2018₱139.7M
Reported complete (DPWH)
No sat.

MFO1-NATIONAL ROAD NETWORK SERVICES IMPROVEMENT/WIDENING OF NATIONAL ROADS, PRIMARY ROADS ALONG N1 DAANG MAHARLIKA (LZ), K0605+527-K0610+100 WITH EXCEPTIONS, SORSOGON

Region V, Region V

2017₱114.8M
Reported complete (DPWH)
View all 82 projects →

4. Implementation

Contract Amount

₱59,398,295.00

Progress

Past target date (DPWH On-Going)

Start Date

April 23, 2024

Target End

February 6, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of LegazpiBgy. 2 - Em's Barrio South
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.