Buildings and Facilities18FH0262

CONSTRUCTION(COMPLETION) OF FOUR STOREY EIGHT CLASSROOM-TWO UNITS (7X18) SCIENCE LABORATORY , TWO UNITS (7X18) ICT LABORATORY & FOUR UNITS REGULAR WORKSHOP SCHOOL BUILDING, TUBLI NATIONAL HIGH SCHOOL, CARAMORAN, CATANDUANES

CONSTRUCTION(COMPLETION) OF FOUR STOREY EIGHT CLASSROOM-TWO UNITS (7X18) SCIENCE LABORATORY , TWO UNITS (7X18) ICT LABORATORY & FOUR UNITS REGULAR WORKSHOP SCHOOL BUILDING, TUBLI NATIONAL HIGH SCHOOL, CARAMORAN, CATANDUANES is a DPWH-tracked public work in Catanduanes DEO, Region V. Reported contract value: ₱4,442,910.79. Status: Reported complete (DPWH). Contractor on record: CTC BUILDER AND SUPPLIES INC FOR CTC BU. Figures trace to dpwh.

Catanduanes DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-18-0017466 · · release to the district office, not itemized per project

    Possible match · score 0.81

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18FH0262 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-06-29 → 2023-02-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION(COMPLETION) OF FOUR STOREY EIGHT CLASSROOM-TWO UNITS (7X18) SCIENCE LABORATORY , TWO UNITS (7X18) ICT LABORATORY & FOUR UNITS REGULAR WORKSHOP SCHOOL BUILDING, TUBLI NATIONAL HIGH SCHOOL, CARAMORAN, CATANDUANES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bocon Seawall/Causeway, Caramoran, Catanduanes
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-18-0017466

₱0.00 · FY2018

Released to Division of Catanduanes (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

113 projects · ₱5.1B total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION OF NATIONAL ROADS, REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4)PRIMARY ROADS DAANG MAHARLIKA (LZ)-K0610+127.70-K0644+136 WIT

Region V, Region V

2017₱144.7M
Reported complete (DPWH)
No sat.

OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-CATANDUANES CIRCUMFERENTIAL ROAD, CATANDUANES

Region V, Region V

2018₱141.4M
Reported complete (DPWH)
No sat.

IMPROVEMENT/WIDENING OF NATIONAL ROADS, WIDENING OF DAANG MAHARLIKA/ASIAN HIGHWAY 26, K0546+740 TO K0552+418.20 WITH EXCEPTIONS, SORSOGON

Region V, Region V

2016₱139.7M
Reported complete (DPWH)
No sat.

STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS, A) PAWA, TABACO CITY, ALBAY; B) SAN PEDRO, IROSIN, SORSOGON; C) BASAG, LIGAO CITY,ALBAY; D) MAURARO, GUINOBATAN, ALBAY

Region V, Region V

2019₱139.0M
Reported complete (DPWH)

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG TIGBAO RIVER, PHASE 2, TACLOBAN CITY

Region VIII, Region VIII

2023₱111.0M
Reported complete (DPWH)

OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG CADAC-AN RIVER (UPSTREAM OF TABUC BRID

Region V, Region V

2019₱96.5M
Reported complete (DPWH)
View all 113 projects →

4. Implementation

Contract Amount

₱4,442,910.79

Progress

Reported complete (DPWH)

Start Date

December 14, 2018

Target End

February 11, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)CatanduanesCaramoranTubli
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.