Construction of River Control/ Drainage System at Lumad Box Culvert, K63.8+260.00 - K63.8+451.50, K63.8+464.00 - K63.8+538, K63.80+800.00 - K63.8+934.00, Mambajao, Camiguin
Construction of River Control/ Drainage System at Lumad Box Culvert, K63.8+260.00 - K63.8+451.50, K63.8+464.00 - K63.8+538, K63.80+800.00 - K63.8+934.00, Mambajao, Camiguin is a DPWH-tracked public work in MAMBAJAO (CAPITAL) (CAMIGUIN), CAMIGUIN, Region X. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: WDM CONST AND SUPPLIES. Figures trace to sumbong.
Total Contract Cost

