Construction of Slope Protection Structure23CJ0006

Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River (Right Dike), Colibangbang to Rang-Ayan Section (Package A), Paniqui, Tarlac

Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River (Right Dike), Colibangbang to Rang-Ayan Section (Package A), Paniqui, Tarlac is a DPWH-tracked public work in PANIQUI (TARLAC), TARLAC, Region III. Reported contract value: ₱47,530,569.42. Status: Reported complete (DPWH). Contractor on record: J H R ENT. Figures trace to sumbong.

PANIQUI (TARLAC), TARLAC, Region III
Region: Region III

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Cubcub, Mayantoc, Tarlac
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Tarlac District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱47,530,569.42

Progress

Reported complete (DPWH)

Start Date

January 30, 2023

Target End

July 29, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.