Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River (Right Dike), Colibangbang to Rang-Ayan Section (Package A), Paniqui, Tarlac
Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River (Right Dike), Colibangbang to Rang-Ayan Section (Package A), Paniqui, Tarlac is a DPWH-tracked public work in PANIQUI (TARLAC), TARLAC, Region III. Reported contract value: ₱47,530,569.42. Status: Reported complete (DPWH). Contractor on record: J H R ENT. Figures trace to sumbong.
Total Contract Cost

