Construction of Slope Protection Structure with Steel Sheet Pile Foundation along Rio Chico River (Package B), Victoria, Tarlac
Construction of Slope Protection Structure with Steel Sheet Pile Foundation along Rio Chico River (Package B), Victoria, Tarlac is a DPWH-tracked public work in VICTORIA (TARLAC), TARLAC, Region III. Reported contract value: ₱47,999,505.20. Status: Reported complete (DPWH). Contractor on record: AMP 723 CONST CORP FORMERLY: A M P CONST / M M SERRANO CONST CO. Figures trace to sumbong.
Total Contract Cost


