Buildings and Facilities22FK0033

CLUSTER XI-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDING_FACILITIES TO SUPPORT SOCIAL SERVICES-1.) CONSTRUCTION OF BRGY. HALL AT BARANGAY BACOLOD, BIGA AND TAGAS, MAGALLANES, 2.) CONSTRUCTION OF B

CLUSTER XI-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDING_FACILITIES TO SUPPORT SOCIAL SERVICES-1.) CONSTRUCTION OF BRGY. HALL AT BARANGAY BACOLOD, BIGA AND TAGAS, MAGALLANES, 2.) CONSTRUCTION OF B is a DPWH-tracked public work in Sorsogon DEO, Region V. Reported contract value: ₱37,820,372.27. Status: Past target date (DPWH On-Going). Contractor on record: M G SALAZAR CONST CORP FOR M G SALAZAR. Figures trace to dpwh.

Sorsogon DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FK0033 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    93% reported · imagery 2020-01-17 → 2025-06-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER XI-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDING_FACILITIES TO SUPPORT SOCIAL SERVICES-1.) CONSTRUCTION OF BRGY. HALL AT BARANGAY BACOLOD, BIGA AND TAGAS, MAGALLANES, 2.) CONSTRUCTION OF B

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure and Embankment of Lungib Seawall, Casiguran, Sorsogon
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Sorsogon DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

222 projects · ₱9.0B total · 0 flags

Other projects by this contractor

View all 222 projects →

4. Implementation

Contract Amount

₱37,820,372.27

Progress

Past target date (DPWH On-Going)

Start Date

April 4, 2022

Target End

March 29, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonCastillaMilagrosa
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.