Roads19BC0041

CONST./IMPVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS ROAD LEADING TO BRIZA BEACH RESORT AT BALLESTEROS, CAGAYAN

CONST./IMPVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS ROAD LEADING TO BRIZA BEACH RESORT AT BALLESTEROS, CAGAYAN is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱9,509,777.08. Status: Reported complete (DPWH). Contractor on record: B A LAGAZO BUILDERS. Figures trace to dpwh.

Cagayan 2nd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROXI-19-0018277 · ₱250,056 · release to the district office, not itemized per project

    Possible match · score 0.76

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19BC0041 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-04-23 → 2025-11-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST./IMPVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS ROAD LEADING TO BRIZA BEACH RESORT AT BALLESTEROS, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-19-0018277

₱250,056.00 · FY2019

Released to School (Davao del Sur National High School) 0911230 - Digos City National High (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

31 projects · ₱147.2M total · 0 flags

Other projects by this contractor

No sat.

PACKAGE VI. 1.) CONSTRUCTION OF TANGLAGAN NATIONAL HS 1 CL WORKSHOP BUILDING ( 7 X 18), 2.) CONSTRUCTION OF TANGLAGAN NATIONAL HS 1 CL WORKSHOP BUILDING ( 7 X 18), 3.)CONSTRUCTION OF TANGLAGAN NATIONAL HS 2 CL WORKSHOP BUILDING ( 7 X 18),

Apayao 2nd DEO, Cordillera Administrative Region

2017₱13.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INSFRASTRUCTURE PROGRAM (BIP)- BIP- MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MUNICIPAL DISASTER AND RISK REDUCTION AND MANAGEMENT OFFICE, STA.PRAXEDES, CAGAYAN

Cagayan 2nd DEO, Region II

2024₱9.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), STA. PRAXEDES, CAGAYAN

Cagayan 2nd DEO, Region II

2024₱9.8M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF SAGPAT ROAD, POBLACION, CALAYAN, CAGAYAN

Cagayan 2nd DEO, Region II

2024₱9.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONIMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - DIBAY-DILAM ROAD CONNECTING THE MAGSI

Cagayan 2nd DEO, Region II

2024₱9.6M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF STANDARD 2 STOREY 6-CL, BAC-DA NATIONAL HIGHSCHOOL, BACSAY, LUNA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2016₱8.1M
Reported complete (DPWH)
View all 31 projects →

4. Implementation

Contract Amount

₱9,509,777.08

Progress

Reported complete (DPWH)

Start Date

May 29, 2019

Target End

September 23, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanBallesterosAmmubuan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.