Buildings and Facilities15BI0080

CONST, DECABACAN MPB, BRGY DECABACAN, DIADI, NUEVA VIZCAYA

CONST, DECABACAN MPB, BRGY DECABACAN, DIADI, NUEVA VIZCAYA is a DPWH-tracked public work in Nueva Vizcaya DEO, Region II. Reported contract value: ₱1,980,000.00. Status: Reported complete (DPWH). Contractor on record: G M PAJARILLAGA CONST. Figures trace to dpwh.

Nueva Vizcaya DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱35,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-16-0027478 · ₱172,617 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,901,050 · G M PAJARILLAGA CONST & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-05-22 → 2024-08-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST, DECABACAN MPB, BRGY DECABACAN, DIADI, NUEVA VIZCAYA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Paitan, Bayombong, Nueva Vizcaya
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-16-0027478

₱172,617.00 · FY2016

Released to 0000 - Don Honorio Ventura Technological State UniversFundi (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction, Decabacan Multi-Purpose Building, Ba

₱1,901,050.32 · G M PAJARILLAGA CONST & SUPPLY

Award / contract ref: 15BI0080

Contractor

A

38 projects · ₱166.5M total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROAD, PAPAYA MALABING WANGAL BINUGAWAN - TADJI RUNRUNO ROAD, K0312+327, RUNRUNO, QUEZON, NUEVA VIZCAYA

Nueva Vizcaya DEO, Region II

2023₱19.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF STA. CRUZ RIVER CONTROL, SALINAS SECTION (PHASE3) BAMBANG,

Nueva Vizcaya DEO, Region II

2018₱14.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF STA. FE RIVER CONTROL, ALMAGUER NORTH SECTION, BAMBANG

Nueva Vizcaya DEO, Region II

2018₱14.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF STA. FE RIVER CONTROL, ALMAGUER SOUTH SECTION, BAMBANG

Nueva Vizcaya DEO, Region II

2018₱14.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MAGAT RIVER CONTROL, VISTA ALEGRE, (PHASE 4) BAYOMBONG, NUEVA VIZCAYA

Nueva Vizcaya DEO, Region II

2017₱12.2M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP, SLOPE, COLLAPSE AND LANDSLIDE-TERTIARY, PAPAYA-MALABING-WANGAL-BINUGAWAN-TADJI-RUNRUNO ROAD, K0312+006-K0312+100,K0314+205-K0314+320, K0314+370-K0314+447, K031

Nueva Vizcaya DEO, Region II

2017₱12.1M
Reported complete (DPWH)
View all 38 projects →

4. Implementation

Contract Amount

₱1,980,000.00

Progress

Reported complete (DPWH)

Start Date

January 25, 2016

Target End

April 23, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)Nueva VizcayaDiadiDecabacan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.