Roads22M00097

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALBERT MORROW BLVD., K1647+840-K1650+802, GENERAL SANTOS CITY

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALBERT MORROW BLVD., K1647+840-K1650+802, GENERAL SANTOS CITY is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱75,478,965.03. Status: Reported complete (DPWH). Contractor on record: SARANGANI ROCKMIXER INC FORMERLY:SARANGANI ROCKMIXER. Figures trace to dpwh.

Region XII, Region XII
Region: Region XII

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22M00097 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-05-15 → 2019-05-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱25,482,432 per km= 1.0x the Region XII median (n=54)

Contract cost ₱75,478,965 ÷ 2.962 km read from the DPWH title (“K1647+840-K1650+802”; K-post / station range length). National percentile: 41. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALBERT MORROW BLVD., K1647+840-K1650+802, GENERAL SANTOS CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2022 GAA. DBM GAA FY2022

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

25 projects · ₱1.7B total · 0 flags

4. Implementation

Contract Amount

₱75,478,965.03

Progress

Reported complete (DPWH)

Start Date

July 13, 2022

Target End

February 15, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)City of General SantosConel
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.