Buildings and Facilities19D00052

CONSTRUCTION OF EVACUATION CENTER AT LILIW, BRGY. IBABANG TAYKIN, LILIW, LAGUNA

CONSTRUCTION OF EVACUATION CENTER AT LILIW, BRGY. IBABANG TAYKIN, LILIW, LAGUNA is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱34,737,387.02. Status: Reported complete (DPWH). Contractor on record: PROTECH CONST. Figures trace to dpwh.

Region IV-A, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19D00052 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-13 → 2019-03-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF EVACUATION CENTER AT LILIW, BRGY. IBABANG TAYKIN, LILIW, LAGUNA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

68 projects · ₱2.0B total · 0 flags

Other projects by this contractor

No sat.

FY 2020 DPWH INFRASTRUCTURE PROJECTS, CONVERGENCE & SPECIAL SUPPORT PROGRAM, CONST./IMPVT. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY, CONSTRUCTION OF ADMINISTRATION BUILDING HEADQUARTERS, CAMP GUILLERMO NAKAR, LUCENA CITY, QUEZON

Region IV-A, Region IV-A

2020₱113.9M
Past target date (DPWH On-Going)
No sat.

DORMITORY FOR GRADUATE STUDENTS,UP LOS BAÑOS, LAGUNA

Region IV-A, Region IV-A

2018₱96.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ADMINISTRATION BUILDING, HEADQUARTERS, CAMP GUILLERMO NAKAR, LUCENA CITY, QUEZON, PHASE VI

Region IV-A, Region IV-A

2025₱94.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- SECONDARY ROADS - STA ROSA- ULAT-TAGAYTAY RD. K0061 + (-020) - K0061 + 297 AND STA

Cavite 3rd DEO, Region IV-A

2021₱68.6M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CARAMORAN POBLACION BYPASS RO

Region V, Region V

2023₱57.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-NEW BAHI BR. (B02809LZ) ALONG DAANG MAHARLIKA (LZ), LUPI, CAMARINES SUR (1ST LEGISLATIVE DISTRICT)

Region V, Region V

2023₱55.4M
Past target date (DPWH On-Going)
View all 68 projects →

4. Implementation

Contract Amount

₱34,737,387.02

Progress

Reported complete (DPWH)

Start Date

September 27, 2019

Target End

April 9, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)LagunaLiliwIlayang Palina
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.