Flood Control and Drainage18JI0042

CONSTRUCTION OF CONCRETE PROTECTION DIKE, STA. 01+841 - STA. 02+020.00 (UPSTREAM) AND STA. 00+666.00 - STA. 00+784.80 (DOWNSTREAM), BRGY. BULAWAN, PAYAO, ZAMBOANGA SIBUGAY

CONSTRUCTION OF CONCRETE PROTECTION DIKE, STA. 01+841 - STA. 02+020.00 (UPSTREAM) AND STA. 00+666.00 - STA. 00+784.80 (DOWNSTREAM), BRGY. BULAWAN, PAYAO, ZAMBOANGA SIBUGAY is a DPWH-tracked public work in Zamboanga Sibugay 1st DEO, Region IX. Reported contract value: ₱19,596,012.33. Status: Reported complete (DPWH). Contractor on record: RUDHIL CONST. Figures trace to dpwh.

Zamboanga Sibugay 1st DEO, Region IX
Region: Region IX

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱20,000

    Probable match · score 0.91

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIX-18-0014811 · ₱372,892 · release to the district office, not itemized per project

    Possible match · score 0.82

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱19,012,000 · RUDHIL CONSTRUCTION & ENTERPRISES, .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-01-16 → 2022-02-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (dike / levee)

₱65,803 per linear m= 0.5x the national median (n=75)

Contract cost ₱19,596,012 ÷ 297.8 linear m read from the DPWH title (“STA. 01+841 - STA. 02+020.00; STA. 00+666.00 - STA. 00+784.80”; station range length (Sta. a+b to c+d)). National percentile: 18. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Zamboanga Sibugay

Based on the coordinates published with the DPWH record and NOAH file ZamboangaSibugay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CONCRETE PROTECTION DIKE, STA. 01+841 - STA. 02+020.00 (UPSTREAM) AND STA. 00+666.00 - STA. 00+784.80 (DOWNSTREAM), BRGY. BULAWAN, PAYAO, ZAMBOANGA SIBUGAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of concrete Protection Dike, Sta. 01+841 - Sta. 02+024.49, Brgy. Bulawan, Payao, Zamboanga Sibugay
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIX-18-0014811

₱372,892.00 · FY2018

Released to (Zamboanga Regional Science High 2018 School) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Dike

₱19,012,000.00 · RUDHIL CONSTRUCTION & ENTERPRISES, .

Award / contract ref: 18JI0042

Contractor

B

1,028 projects · ₱22.5B total · 0 flags

4. Implementation

Contract Amount

₱19,596,012.33

Progress

Reported complete (DPWH)

Start Date

April 2, 2018

Target End

November 7, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF CONCRETE PROTECTION DIKE, STA. 01+841 - STA. 02+020.00 (UPSTREAM) AND STA. 00+666.00 - STA. 00+784.80 (DOWNSTREAM), BRGY. BULAWAN, PAYAO, ZAMBOANGA SIBUGAY.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/935a1aad-54a7-4105-9d1a-1f20d5319821

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga SibugayPayaoKulasian
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.