Roads22KG0072

ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS,DOBLESTON-BUTADON ROAD,K1998+242-K1998+696,SND,LANAO DEL NORTE

ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS,DOBLESTON-BUTADON ROAD,K1998+242-K1998+696,SND,LANAO DEL NORTE is a DPWH-tracked public work in Lanao del Norte 2nd DEO, Region X. Reported contract value: ₱7,806,618.00. Status: Reported complete (DPWH). Contractor on record: U M D CONST. Figures trace to dpwh.

Lanao del Norte 2nd DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱50,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22KG0072 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-01-31 → 2022-01-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS,DOBLESTON-BUTADON ROAD,K1998+242-K1998+696,SND,LANAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures and Drainage System along Mandulog Bridge II (B00881MN), (Downstream, R/S), Iligan City, Lanao del Norte
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Lanao del Norte 2nd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

30 projects · ₱271.1M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD WITH SLOPE PROTECTION, BRGY. KOREO, SULTAN NAGA DIMAPORO, LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2024₱28.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS MALABANG-DOBLESTON-TUKURAN RD - K1971 + 274 - K1972 + 240

Region X, Region X

2024₱28.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY KOREO, SND, LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2024₱17.1M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, DOBLESTON-BUTADON ROAD, K1997+000-K1997+270; K1997+504-K1997+661.50; K2002+579-K2002+597, SULTAN NAGA DIMAPORO, LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2023₱14.8M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS MALABANG-DOBLESTON-TUKURAN ROAD, K1993+223

Lanao del Norte 2nd DEO, Region X

2023₱14.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF POBLACION KAPATAGAN-SAN VICENTE-CATHEDRAL FALLS PROVINCIAL ROAD, KAPATAGAN LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2024₱14.3M
Reported complete (DPWH)
View all 30 projects →

4. Implementation

Contract Amount

₱7,806,618.00

Progress

Reported complete (DPWH)

Start Date

April 13, 2022

Target End

July 19, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS,DOBLESTON-BUTADON ROAD,K1998+242-K1998+696,SND,LANAO DEL NORTE.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/93b26752-6b24-43ab-9b56-f92bb7c9e154

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Lanao del NorteSultan Naga DimaporoMamagum
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.