Roads22FF0016

001;ASSET PRESERVATION PREVENTIVE MAINT.-TERTIARY ROADS-ASPHALT OVERLAY NAGA CITY-BOUNDARY CALABANGA-BALONGAY RD. KO448+986.90-KO 450+714.5 CALABANGA CAMARINES SUR

001;ASSET PRESERVATION PREVENTIVE MAINT.-TERTIARY ROADS-ASPHALT OVERLAY NAGA CITY-BOUNDARY CALABANGA-BALONGAY RD. KO448+986.90-KO 450+714.5 CALABANGA CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 3rd DEO, Region V. Reported contract value: ₱25,123,370.00. Status: Reported complete (DPWH). Contractor on record: 301 ENGINEERS. Figures trace to dpwh.

Camarines Sur 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FF0016 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-11 → 2025-03-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: 001;ASSET PRESERVATION PREVENTIVE MAINT.-TERTIARY ROADS-ASPHALT OVERLAY NAGA CITY-BOUNDARY CALABANGA-BALONGAY RD. KO448+986.90-KO 450+714.5 CALABANGA CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Barangay Concepcion Peque±a, Naga City, Camarines Sur
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Camarines Sur 3rd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

47 projects · ₱246.5M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF TWO(2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING(UNDER DEPED CY 2018 BEFF) STA. CRUZ ELEMENTARY SCHOOL NAGA CITY (SITE 1)

Camarines Sur 3rd DEO, Region V

2018₱19.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TWO(2) STOREY SIX(6) CLASSROOM SCHOOL BUILDING (UNDER DEPED CY 2018 BEFF) STA CRUZ ELEMENTARY SCHOOL NAGA CITY (SITE 2)

Camarines Sur 3rd DEO, Region V

2018₱19.1M
Reported complete (DPWH)
No sat.

ORG.OUTCOME2:PROTECT LIVES & PROP. AGAINST MAJOR FLOOD-FLOOD MGT PROG-CONST/MAINT OF FLOOD MIT. STRUCT.& DRAINAGE SYSTEMS-CONST/REHAB/IMPVT,CANAMAN FLOOD CONTROL,SAN AGUSTIN-HARING-SAN VICENTE-DEL ROSARIO CREEK (SAN VICENTE-DEL ROSARIO SEC) CANAMAN CAMSUR

Camarines Sur 3rd DEO, Region V

2019₱18.5M
Reported complete (DPWH)
No sat.

DEPED CY-2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 1,CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOMS SCHOOL BUILDING,GOA NATIONAL HIGH SCHOOL,GOA, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2018₱15.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-BOMBON BR. 1 (B00422LZ)

Camarines Sur 3rd DEO, Region V

2019₱14.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-QUIPAYO BR. (B00425LZ) ALONG NAGA CITY BDRY-CALABANGA-BALONGAY RD.

Camarines Sur 3rd DEO, Region V

2019₱12.1M
Reported complete (DPWH)
View all 47 projects →

4. Implementation

Contract Amount

₱25,123,370.00

Progress

Reported complete (DPWH)

Start Date

May 24, 2022

Target End

September 21, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurCalabangaSanto Domingo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.