301 ENGINEERS is listed as a company organization in Philippine public procurement records on this site, with 47 linked DPWH project(s) totaling about ₱246,486,148.39. Recorded delivery grade A (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
301 ENGINEERS
ARegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 47
- Total value
- ₱246,486,148.39
- Published flags
- 0
- Region
- Camarines Sur 1st DEO · Region V
Licensed officers (PCAB)
- Mario Romero Aclan · Authorized Managing Officer (PCAB license 38364) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for 301 ENGINEERS — not an accusation or finding of wrongdoing.
Score: 90.90 / 100 · Projects in sample: 47 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 91.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 91.3
- lateCompletedProjects
- 8
- onTimeCompletedProjects
- 38
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 46
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 47
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 47
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
26 geotagged projects — Open full map
- 001;ASSET PRESERVATION PREVENTIVE MAINT.-TERTIARY ROADS-ASPHALT OVERLAY NAGA CITY-BOUNDARY CALABANGA-BALONGAY RD. KO448+986.90-KO 450+714.5 CALABANGA CAMARINES SUR22FF0016 · ₱25,123,370.00 · mapped
- CONSTRUCTION OF TWO(2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING(UNDER DEPED CY 2018 BEFF) STA. CRUZ ELEMENTARY SCHOOL NAGA CITY (SITE 1)18FE0098 · ₱19,083,762.00 · mapped
- CONSTRUCTION OF TWO(2) STOREY SIX(6) CLASSROOM SCHOOL BUILDING (UNDER DEPED CY 2018 BEFF) STA CRUZ ELEMENTARY SCHOOL NAGA CITY (SITE 2)18FE0102 · ₱19,068,000.00 · mapped
- ORG.OUTCOME2:PROTECT LIVES & PROP. AGAINST MAJOR FLOOD-FLOOD MGT PROG-CONST/MAINT OF FLOOD MIT. STRUCT.& DRAINAGE SYSTEMS-CONST/REHAB/IMPVT,CANAMAN FLOOD CONTROL,SAN AGUSTIN-HARING-SAN VICENTE-DEL ROSARIO CREEK (SAN VICENTE-DEL ROSARIO SEC) CANAMAN CAMSUR19FE0049 · ₱18,521,000.00 · mapped
- DEPED CY-2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 1,CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOMS SCHOOL BUILDING,GOA NATIONAL HIGH SCHOOL,GOA, CAMARINES SUR18FF0104 · ₱15,593,331.01 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-BOMBON BR. 1 (B00422LZ)19FE0003 · ₱14,611,285.89 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-QUIPAYO BR. (B00425LZ) ALONG NAGA CITY BDRY-CALABANGA-BALONGAY RD.19FE0004 · ₱12,063,200.00 · mapped
- CLUSTER 11 SB - CONSTRUCTION OF UNIQUE WORKSHOP AND REGULAR WORKSHOP SCHOOL BUILDING AT SIPOCOT, CAMARINES SUR17FN0075 · ₱9,027,822.06
- CONSTRUCTION OF SATELLITE MATERIALS LABORATORY BUILDING, DPWH CAMARINES SUR 1ST, 2ND & 5TH DISTRICT ENGINEERING OFFICE COMPOUND, BARAS, CANAMAN, CAMARINES SUR19FE0041 · ₱6,965,116.52 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIARY ROAD FRATERNIDAD-BIAK NA BATO-E. ANGELES-BAGUMBAYAN-K0436+025-K0436+31519FE0002 · ₱6,376,000.00 · mapped
- INDV. PROJECT - REHAB./RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG IRIGA CITY -MASOLI ROAD, IRIGA CITY ( K 0479+700 - K 0479+923)17FG0016 · ₱5,071,363.83 · mapped
- 001;BRIDGE-RETROFITTIN/STRENGHTENING OF PERMANENT BRIDGES-RETROFITTING/STRENGHTENING OF BRIDGE -HANAWAN BRIDGE(B00416LZ) ALONG PILI TIGAON ALBAY BOUNDARY ROAD OCAMPO CAM. SUR22FF0011 · ₱4,899,883.56 · mapped
- CONCRETING OF BRGY. CAINGIN FMR, BRGY. CAINGIN, STA. ROSA CITY, LAGUNA16DI0087 · ₱4,799,186.93
- CONCRETING OF BRGY. MACABLING FMR, BRGY. MACABLING, STA. ROSA CITY, LAGUNA16DI0083 · ₱4,790,138.50
- CONCRETING OF BRGY. BINANUAANAN GRANDE FMR, BRGY. BINANUAANAN GRANDE CALABANGA, CAMARINES SUR19FE0081 · ₱4,721,425.15 · mapped
- CONSTRUCTION OF CLASSROOMS(BATCH 9) AT A. SALVACION ES, LIBMANAN, CS AND B. SOGOD ES, LIBMANAN, CS16FD0037 · ₱4,320,483.14
- CONSTRUCTION OF BARANGAY ROAD,BARANGAY PINIT OCAMPO CAMARINES SUR20FF0101 · ₱4,227,769.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM IMPROVEMENT OF ASSEMBLY HALL, A.LABAS OLYMPIA SUBD. B. MALITLIT SAN LORENZO PH I, STA. ROSA CITY, LAGUNA 1ST L.D.15DI0193 · ₱3,863,580.00
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CAIMA, SIPOCOT, CAMARINES SUR19FN0069 · ₱3,840,513.65 · mapped
- 001: BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-RETROFITTING/STRENGTHENING OF BRIDGE-MAGARAO BR. 2 (B00420LZ) ALONG NAGA CITY BDRY.-CALABANGA-BALONGAY RD., MAGARAO, CAMARINES SUR22FF0021 · ₱2,939,823.44 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL & BARANGAY HEALTH CENTER), SAN VICENTE, LUPI, CAMARINES SUR21FD0026 · ₱2,929,000.00 · mapped
- CONSTRUCTION OF COVERED COURT, BRGY. BELEN, CALABANGA, CAMARINES SUR17FE0029 · ₱2,880,193.58
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) , BRGY. SAN ISIDRO, CALABANGA, CAMARINES SUR17FE0046 · ₱2,830,424.93
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-SAN ISIDRO BR. (B00424LZ) ALONG NAGA CITY BDRY-CALABANGA-BALONGAY RD19FE0011 · ₱2,790,033.00 · mapped
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING AT SAN RAFAEL ELEMENTARY SCHOOL, RAGAY, CAMARINES SUR17FN0055 · ₱2,734,340.00
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING AT LUBIGAN SR., HIGH SCHOOL - SNHS (ANNEX), SIPOCOT, CAMARINES SUR17FN0058 · ₱2,670,900.00
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING AT GABI ELEMENTARY SCHOOL, SIPOCOT, CAMARINES SUR17FN0056 · ₱2,663,400.00
- CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING AT LUBIGAN JR., ELEMENTARY SCHOOL, SIPOCOT, CAMARINES SUR17FN0057 · ₱2,645,100.00
- INDV. PROJECT - REHAB./RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG NABUA-BALATAN ROAD, BALATAN, CAMARINES SUR (K0484+033 - K 0484+331)17FG0015 · ₱2,560,286.28 · mapped
- REHABILITATION OF WATER SUPPLY SYSTEM LEVEL II,CASTILLO, CABUSAO, CAMARINES SUR21FD0087 · ₱2,397,000.00 · mapped
- CONST. OF CLASSROOMS (BATCH 9) AT SAN JOAQUIN ES, SAN FERNANDO, CS16FD0041 · ₱2,053,276.86
- CONSTRUCTION OF SCHOOL BUILDING, BRGY. CARANAN, PASACAO, CAMARINES SUR 2ND LD15FD0086 · ₱1,937,484.08
- LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF BARANGAY HALL PULONG SANTA CRUZ, STA. ROSA CITY, LAGUNA 1ST L.D.15DI0189 · ₱1,922,622.98
- LIP - IMPROVEMENT OF BARANGAY HALL DITA, STA. ROSA CITY, LAGUNA 1ST L.D.15DI0164 · ₱1,920,622.03
- REBLOCKING/WIDENING OF BRGY. ROAD, BRGY. GRS TO BRGY. CATABANGAN PROPER, RAGAY, CAMARINES SUR18FN0029 · ₱1,888,579.50 · mapped
- CONCRETING OF BRIDGE AT BRGY. SAN RAFAEL SUR, LUPI, CAMARINES SUR17FN0043 · ₱1,882,383.00
- CONCRETING OF BARANGAY ROAD, BRGY. SAN RAFAEL SUR, LUPI, CAMARINES SUR19FN0174 · ₱1,880,640.00 · mapped
- CONCRETING OF BARANGAY ROAD AT BRGY. SERRANZANA TO BRGY. SALVACION, SIPOCOT, CAMARINES SUR17FN0028 · ₱1,880,621.00
- CONCRETING OF BARANGAY ROAD, ZONE 6, BRGY. SAN PEDRO, CABUSAO, CAMARINES SUR19FN0154 · ₱1,880,383.79 · mapped
- CONSTRUCTION OF BARANGAY ROAD, STA. 0+000-STA. 0+198, BRGY. CAGSAO, CALABANGA,CAMARINES SUR17FE0022 · ₱1,879,883.46
- CONCRETING OF BARANGAY ROAD, BRGY. SAN RAFAEL NORTE, LUPI, CAMARINES SUR19FN0169 · ₱1,879,433.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING DOMINOROG CALABANGA, CAMARINES SUR19FE0031 · ₱1,878,800.00 · mapped
- CONSTRUCTION OF SEAWALL AT BRGY. MANGA, SIPOCOT, CAMARINES SUR17FN0026 · ₱1,878,750.00
- CONCRETING OF BARANGAY ROAD AT BRGY. MANTILA, SIPOCOT, CAM. SUR17FN0019 · ₱1,408,044.20
- CONCRETING OF BARANGAY ROAD AT BRGY. TIBLE, SIPOCOT, CAM. SUR17FN0018 · ₱1,407,741.02
- CONSTRUCTION OF WATER SUPPLY SYSTEM LEVEL II,SOOC, LUPI, CAMARINES SUR21FD0086 · ₱959,000.00 · mapped
- REHABILITATION OF BARANGAY ROAD, BARANGAY NORTH CENTRO, SIPOCOT, CAMARINES SUR18FN0053 · ₱940,151.00 · mapped
Across government
- RENOVATION AND IMPROVEMENT OF PSYCHIATRY WARD
- Repair/Conversion of Existing Two (2) Unit Hospita
- Construction of Obstetrical Ward Phase 2₱9,082,159.68· 2020-12-14· Health facility· 301 ENGINEERS· BICOL REGION GENERAL HOSPITAL AND GERIATRIC MEDICAL CENTER(F
- Expansion of Fiber Glass Canopy at NEW E.R Main
- Fabrication & Mounting/Installation of Windows
- Rehabilitation and Conversion of Existing Medical
- Fire Exit Stairs and Fire Rated Doors for New 5-St
- Construction of Dermatology Center
- Negotiated Procurement of the Design & Build
- Negotiated Procurement of the Design & Build
- Negotiated Procurement of the Design & Build
- Re-bid Design & Build of Two (2) Storey
- construction of retaining wall
- Const. of Acute Crisis Intervention Service Bldg.
- Repair/Replacement of Entiire Corrugated G.I Sheet
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
