Roads15N00057
ROAD UPGRADING (GRAVEL TO PAVED), BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA ROAD, CHAINAGE 114-CHAINAGE 2204, CHAINAGE 2548-CHAINAGE 4450, CHAINAGE 4550-CHAINAGE 4828 (S00481MN), K1399+648-K1400+153 (S00478MN), VERUELA, AGUSAN DEL SUR is a DPWH-tracked public work in Region XIII, Region XIII. Reported contract value: ₱113,275,763.32. Status: Reported complete (DPWH). Contractor on record: LEGACY CONST CORP FORMERLY: LEGACY CONST. Figures trace to dpwh.
Region XIII, Region XIII
Region: Region XIII
Loading satellite imagery…
Unit-cost benchmark · Road, cost per km (new paving / upgrading)
₱224,308,442 per km= 7.5x the Region XIII median (n=88)
Contract cost ₱113,275,763 ÷ 0.505 km read from the DPWH title (“K1399+648-K1400+153”; K-post / station range length). National percentile: 100. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology
Cite this record
Love the Philippines. “ROAD UPGRADING (GRAVEL TO PAVED), BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA ROAD, CHAINAGE 114-CHAINAGE 2204, CHAINAGE 2548-CHAINAGE 4450, CHAINAGE 4550-CHAINAGE 4828 (S00481MN), K1399+648-K1400+153 (S00478MN), VERUELA, AGUSAN DEL SUR.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/94b1a4c3-89d8-4c58-a9d3-f35c902606a7
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.