Buildings and Facilities24BH0228

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 3) INCLUDING FACILITIES, BARANGAY SAN FABIAN,ECHAGUE ISABELA

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 3) INCLUDING FACILITIES, BARANGAY SAN FABIAN,ECHAGUE ISABELA is a DPWH-tracked public work in Isabela 4th DEO, Region II. Reported contract value: ₱49,500,000.00. Status: Past target date (DPWH On-Going). Contractor on record: MA TESORO CONST. Figures trace to dpwh.

Isabela 4th DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱49,360,177

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    88% reported · imagery 2021-06-22 → 2025-06-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 3) INCLUDING FACILITIES, BARANGAY SAN FABIAN,ECHAGUE ISABELA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Barangay Fugu Flood Control Structure Section 1, Jones, Isabela
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Isabela 4th DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24BH0228

₱49,360,177.15 · Awardee from PhilGEPS

Award / contract ref: 24BH0228

Contractor

D

83 projects · ₱1.8B total · 1 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K0361+590 - K0361+844, K0361+866 - K0364+014

Region II, Region II

2025₱134.3M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GAGABUTAN FLOOD CONTROL STRUCTURE STA. 0+620 - STA. 1

Isabela 4th DEO, Region II

2025₱96.5M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS - MAHARLIKA HIGHWAY - K0346+694 - K0347+282, K0347+430 -K0347+993, K0350+700 - K0351+561, K0352+0

Region II, Region II

2025₱72.5M
Past target date (DPWH On-Going)
No sat.

Construction of Amobocan, Flood Control Project, Amobocan, Cauayan, Isabela (Package 1)

CITY OF CAUAYAN (ISABELA), ISABELA, Region II

2024₱70.8M
Reported complete (DPWH)
No sat.

Construction of Carabatan Chica Flood Control Project, Cauayan City, Isabela

CITY OF CAUAYAN (ISABELA), ISABELA, Region II

2024₱70.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAYOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BARINGIN NORTE FLOOD CONTROL

Isabela 4th DEO, Region II

2024₱70.8M
Reported complete (DPWH)
View all 83 projects →

4. Implementation

Contract Amount

₱49,500,000.00

Progress

Past target date (DPWH On-Going)

Start Date

June 17, 2024

Target End

January 2, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaEchagueSan Fabian
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.