Buildings and Facilities23BI0101

CONSTRUCTION OF 2STY6CL, BALONG IS, AMBAGUIO, NUEVA VIZCAYA

CONSTRUCTION OF 2STY6CL, BALONG IS, AMBAGUIO, NUEVA VIZCAYA is a DPWH-tracked public work in Nueva Vizcaya DEO, Region II. Reported contract value: ₱19,220,000.00. Status: Reported complete (DPWH). Contractor on record: N-J CONST. Figures trace to dpwh.

Nueva Vizcaya DEO, Region II
Region: Region II

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱19,027,800 · N-J CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-02-10 → 2025-02-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 2STY6CL, BALONG IS, AMBAGUIO, NUEVA VIZCAYA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Nalubbunan Flood Control along Magat River, Quezon, Nueva Vizcaya
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Nueva Vizcaya DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of 2STY6CL, Balong IS, Ambaguio, Nuev

₱19,027,800.00 · N-J CONSTRUCTION

Award / contract ref: 23BI0101

Contractor

B

69 projects · ₱407.3M total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - PAPAYA-MALABING-WANGAL-BINUGAWAN-TADJI-RUNRUNO RD - K0301 + 196 - K0302 + 000, KASIBU, NU

Nueva Vizcaya 2nd DEO, Region II

2025₱28.3M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) JCT. DAANG MAHARLIKA-MASOC-AMBAGUIO ROAD

Nueva Vizcaya DEO, Region II

2023₱20.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF CONCRETE BRIDGE AT SITIO ATAB GOING TO BA

Nueva Vizcaya DEO, Region II

2023₱19.8M
Reported complete (DPWH)
No sat.

Construction of Bambang Cupas CIS Canal Lining and Flood Control Structure, Bambang, Nueva Vizcaya

BAMBANG (NUEVA VIZCAYA), NUEVA VIZCAYA, Region II

2024₱19.6M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING KASIBU, NUEVA VIZCAYA

Nueva Vizcaya 2nd DEO, Region II

2024₱19.4M
Past target date (DPWH On-Going)
No sat.

CONCRETING OF DENGAO - NAKGAAN FMR, BRGY. AHIN, TINOC, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2024₱14.8M
Past target date (DPWH On-Going)
View all 69 projects →

4. Implementation

Contract Amount

₱19,220,000.00

Progress

Reported complete (DPWH)

Start Date

August 9, 2023

Target End

May 9, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF 2STY6CL, BALONG IS, AMBAGUIO, NUEVA VIZCAYA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/95603ff3-881e-4139-8530-b3e4652b7476

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)Nueva VizcayaAmbaguioSalingsingan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.