Water Provision and Storage21IG0069

UPGRADING OF WATER SUPPLY SYSTEM, BAYBAY CITY, LEYTE

UPGRADING OF WATER SUPPLY SYSTEM, BAYBAY CITY, LEYTE is a DPWH-tracked public work in Leyte 5th DEO, Region VIII. Reported contract value: ₱19,208,000.00. Status: Reported complete (DPWH). Contractor on record: JA ACHACOSO ENT. Figures trace to dpwh.

Leyte 5th DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21IG0069 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-20 → 2024-04-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: UPGRADING OF WATER SUPPLY SYSTEM, BAYBAY CITY, LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures, Barangay Sto Rosario, Baybay City, Leyte
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Leyte 5th DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

132 projects · ₱3.0B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF THE REGIONAL CULTURAL HUB, PHASE I, TAGBILARAN CITY, BOHOL PROVINCE

Region VII, Region VII

2021₱135.1M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE, PACKAGE 2, BARANGAY STO NIÑO - BARANGAY MINDANAO, MALABU

Cebu 7th DEO, Region VII

2025₱97.5M
Past target date (DPWH On-Going)
No sat.

ROAD WIDENING PALOMPON - ISABEL - MERIDA - ORMOC ROAD K1098+000 - K1101+416

Leyte 4th DEO, Region VIII

2018₱96.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) - AS PER R.A. 11239, CONSTRUCTION AND INSTALLATION OF SOLAR STREETLIGHTS, SAFETY SIGNS AND DEVICES - K0065+000 - K0072+000, ARGAO, CEBU

Cebu 2nd DEO, Region VII

2021₱96.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SHORELINE PROTECTION STRUCTURES - JCT. HIMAY-ANGAN - SILAGO - ABUYOG BDRY. RD. (S00228LT) - ALONG ST. BERNARD SECTION, SOUTHERN LEYTE

Region VIII, Region VIII

2023₱89.8M
Past target date (DPWH On-Going)

CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE - JCT. HIMAY-ANGAN - SILAGO - ABUYOG BDRY. RD. - (S00228LT) ALONG SAN JUAN SECTION, SOUTHERN LEYTE

Region VIII, Region VIII

2023₱85.6M
Reported complete (100% progress, DPWH status On-Going)
View all 132 projects →

4. Implementation

Contract Amount

₱19,208,000.00

Progress

Reported complete (DPWH)

Start Date

October 14, 2021

Target End

April 11, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteCity of BaybayPoblacion Zone 1
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.