Buildings and Facilities16HL0123No coordinates published by DPWH

CONSTRUCTION OF 1 UNIT 3 STY 6 CL @ ACTIN NATIONAL HIGH SCHOOL, BASAY, NEGROS ORIENTAL

CONSTRUCTION OF 1 UNIT 3 STY 6 CL @ ACTIN NATIONAL HIGH SCHOOL, BASAY, NEGROS ORIENTAL is a DPWH-tracked public work in Negros Oriental 3rd DEO, Negros Island Region. Reported contract value: ₱10,294,828.00. Status: Reported complete (DPWH). Contractor on record: C LARA CONST. Figures trace to dpwh.

Negros Oriental 3rd DEO, Negros Island Region

DPWH did not publish coordinates for this project. Location estimated from the project title (named structure or place in OpenStreetMap); satellite images may not show the exact site.

Region: Negros Island Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱36,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-C-16-0015251 · · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16HL0123 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-05-21 → 2019-03-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,715,805 per classroom= 1.2x the Negros Island Region median (n=274)

Contract cost ₱10,294,828 ÷ 6 classroom read from the DPWH title (“3 STY 6 CL”; classroom count in title). National percentile: 51. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 UNIT 3 STY 6 CL @ ACTIN NATIONAL HIGH SCHOOL, BASAY, NEGROS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱36,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Villa Miranda (Brgy.6 - A), Victorias City, Negros Occidental
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-C-16-0015251

₱-134,095.00 · FY2016

Released to Regional Office - X (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

51 projects · ₱242.3M total · 0 flags

4. Implementation

Contract Amount

₱10,294,828.00

Progress

Reported complete (DPWH)

Start Date

November 3, 2016

Target End

June 30, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF 1 UNIT 3 STY 6 CL @ ACTIN NATIONAL HIGH SCHOOL, BASAY, NEGROS ORIENTAL.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/9679e797-f708-416a-b3b2-d3035a9b6bda

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalBasay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.