Bridges22NE0057

REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES CANAHAAN BR. (B00080DG) ALONG JCT MAGSAYSAY-CAGDIANAO ROAD, BRGY. R, ECLEO SR., CAGDIANAO, DINAGAT ISLANDS

REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES CANAHAAN BR. (B00080DG) ALONG JCT MAGSAYSAY-CAGDIANAO ROAD, BRGY. R, ECLEO SR., CAGDIANAO, DINAGAT ISLANDS is a DPWH-tracked public work in Dinagat Islands DEO, Region XIII. Reported contract value: ₱974,998.86. Status: Reported complete (DPWH). Contractor on record: RADIAN CONST AND SUPPLY. Figures trace to dpwh.

Dinagat Islands DEO, Region XIII
Region: Region XIII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱36,658 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22NE0057 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-08-07 → 2025-11-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES CANAHAAN BR. (B00080DG) ALONG JCT MAGSAYSAY-CAGDIANAO ROAD, BRGY. R, ECLEO SR., CAGDIANAO, DINAGAT ISLANDS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱36,658,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Luna Br. Phase II, Sta. 0+000.00 - Sta. 0+317.05, San Jose, Dinagat Islands
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Dinagat Islands DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

210 projects · ₱1.3B total · 0 flags

4. Implementation

Contract Amount

₱974,998.86

Progress

Reported complete (DPWH)

Start Date

March 17, 2022

Target End

June 28, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Dinagat IslandsCagdianaoR. Ecleo, Sr.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.