Buildings and Facilities23FK0111

CLUSTER XLVIII- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)- 1.) CONST. OF MULTI PURPOSE BLDG. ((DOLE BLDG.) BRGY. CABID-AN, SORSOGON CITY 2.) CONST. OF MULTI-PURPOSE BLDG. (MAGALLANES PNP BLDG.) BRGY. BINISITAHAN DE

CLUSTER XLVIII- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)- 1.) CONST. OF MULTI PURPOSE BLDG. ((DOLE BLDG.) BRGY. CABID-AN, SORSOGON CITY 2.) CONST. OF MULTI-PURPOSE BLDG. (MAGALLANES PNP BLDG.) BRGY. BINISITAHAN DE is a DPWH-tracked public work in Sorsogon DEO, Region V. Reported contract value: ₱33,957,406.19. Status: Reported complete (DPWH). Contractor on record: RODA CONST. Figures trace to dpwh.

Sorsogon DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23FK0111 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-01-30 → 2022-01-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER XLVIII-  CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)- 1.) CONST. OF MULTI PURPOSE BLDG. ((DOLE BLDG.) BRGY. CABID-AN, SORSOGON CITY 2.) CONST. OF MULTI-PURPOSE BLDG. (MAGALLANES PNP BLDG.) BRGY. BINISITAHAN DE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Protection Measures along Cawayan River, Brgy. Gimaloto and Brgy. Barayong, Sorsogon City
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Sorsogon DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

62 projects · ₱2.1B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION_IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-MATNOG-BULAN-MAGALLANES WEST COAST HIGHWAY, SORSOGON PACKAGE III, MAGALLANES, SORSOGON

Sorsogon DEO, Region V

2022₱106.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-MULTI-PURPOSES BUILDING_FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING (INCLUDING ROADWAYS), SORSOGON CAPITOL COMPOUND, SORSOGON CITY

Sorsogon DEO, Region V

2022₱79.2M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NAT'L. ROADS-REHAB/RECONST./UPGRADING OF DAMAGED PAVED NAT'L. ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEV'T. MANAGEMENT (HDM-4) TERTIARY RECONST. FROM CONCRETE TO CONCRETE-BACON SAWANGA-PTO. DIAZ ROAD

Sorsogon DEO, Region V

2017₱73.0M
Reported complete (DPWH)
No sat.

SIPAG: MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/ MEETINGS INCENTIVES CONFERENCES FOR EDUCATION, SPORTS BUILDING (MICES) AND PRIMARY HEALTH CENTERS AT CAMALIG, ALBAY

Albay 2nd DEO, Region V

2023₱71.4M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST./REHAB. OF HIMAOYON FLOOD CONTROL UPSTREAM & DOWNSTREAM, CASIGURAN

Sorsogon DEO, Region V

2019₱68.9M
Reported complete (DPWH)
No sat.

CLUSTER XXVIII -CONVENGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) BASIC INFRASTRUCTURE PROGRAM (BIP)MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- 1.) CONSTRUCTION OF MULTI-PURPOSE BUILDING, SORSOGON EAST CENTRAL SCHOOL, BRGY.BURABOD, SORSOGO

Sorsogon DEO, Region V

2024₱67.8M
Reported complete (100% progress, DPWH status On-Going)
View all 62 projects →

4. Implementation

Contract Amount

₱33,957,406.19

Progress

Reported complete (DPWH)

Start Date

September 22, 2023

Target End

July 10, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonCity of SorsogonCabid-An
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.