Water Provision and Storage23DF0157

CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORSWATER SUPPLY SYSTEMCONSTRUCTION OF SOLAR WATER SYSTEM, ROSARIO, CAVITE

CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORSWATER SUPPLY SYSTEMCONSTRUCTION OF SOLAR WATER SYSTEM, ROSARIO, CAVITE is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱9,726,501.78. Status: Past target date (DPWH On-Going). Contractor on record: R C SIMON CONST. Figures trace to dpwh.

Cavite 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱37,500 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23DF0157 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    30% reported · imagery 2021-04-23 → 2025-04-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORSWATER SUPPLY SYSTEMCONSTRUCTION OF SOLAR WATER SYSTEM, ROSARIO, CAVITE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱37,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures, Road and Other Improvements in Palico 4, Imus, Cavite
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Cavite 1st DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

72 projects · ₱521.2M total · 1 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), DASMARIÑAS CITY, CAVITE

Cavite 3rd DEO, Region IV-A

2023₱29.7M
Reported complete (DPWH)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRASTRUCTURE PRO ALLEVIATING GAPS (SIPAG) SIPAG - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIESCONST OF PUNTA-OPEN CANAL DIV RD,PASONG CAMACHILE SE

Cavite 1st DEO, Region IV-A

2024₱26.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BLDG. AT BRGY. SALITRAN 2, CITY OF DASMARIÑAS, CAVITE AND CONSTRUCTION OF MULTI-PURPOSE BLDG. AT BRGY. PALIPARAN 1, CITY OF DASMARIÑAS, CAVITE

Cavite 3rd DEO, Region IV-A

2023₱19.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMCONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0034 + 326 - K0035 + 067

Cavite 1st DEO, Region IV-A

2024₱19.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - IMPROVEMENT OF INTERSECTION INCL. ROAD SAFETY AT MOLINO III, BACOOR, CAVITE

Cavite 3rd DEO, Region IV-A

2021₱13.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING (BICLATAN ES), BARANGAY BICLATAN, GENERAL TRIAS CITY; REHABILITATION OF MULTI-PURPOSE BUILDING (BARANGAY HALL),

Cavite 1st DEO, Region IV-A

2019₱12.8M
Reported complete (DPWH)
View all 72 projects →

4. Implementation

Contract Amount

₱9,726,501.78

Progress

Past target date (DPWH On-Going)

Start Date

July 6, 2023

Target End

January 1, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteRosarioPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.