Buildings and Facilities17DF0153

CONSTRUCTION OF 4STY 16CL SCHOOL BUILDING AT CAVITE NATIONAL HIGH SCHOOL, CAVITE CITY

CONSTRUCTION OF 4STY 16CL SCHOOL BUILDING AT CAVITE NATIONAL HIGH SCHOOL, CAVITE CITY is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱49,021,966.45. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: BAQPRINCE CONST AND TRADING CORP. Figures trace to dpwh.

Cavite 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱35,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0009159 · ₱86,116 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱41,458,394 · HEXAMINDZ

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-08-10 → 2023-12-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 4STY 16CL SCHOOL BUILDING AT CAVITE NATIONAL HIGH SCHOOL, CAVITE CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control in Taguilid River, Brgy. Marulas Section, Kawit, Cavite
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0009159

₱86,116.00 · FY2017

Released to Division of Camarines Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

17DF0152

₱41,458,394.15 · HEXAMINDZ

Award / contract ref: 17DF0152

Confirmed (exact contract ID) · 100%

17DF0149

₱37,311,060.78 · Awardee from PhilGEPS

Award / contract ref: 17DF0149

Confirmed (exact contract ID) · 100%

17DF0150

₱40,712,650.65 · N.B. AVILA CONSTRUCTION - CAVITE

Award / contract ref: 17DF0150

Contractor

A

185 projects · ₱6.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION (COMPLETION) OF ROSARIO GYMNASIUM, ROSARIO, CAVITE

Cavite 1st DEO, Region IV-A

2024₱147.1M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, GENERAL TRIAS, CAVITE, PHASE 3

Region IV-A, Region IV-A

2023₱99.6M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF REVETMENT ALONG IMUS RIVER,BRGY.BINAKAYAN, PHASE II

Cavite 1st DEO, Region IV-A

2023₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSMALABON GRANDE- SAN JUAN - MULAWIN DIVERSION ROAD, LAVANYA SECTION, BRGY. SAN JUAN II, GEN. TRIAS CITY, CAV

Cavite 1st DEO, Region IV-A

2023₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSMALABON GRANDE- SAN JUAN - MULAWIN DIVERSION ROAD, MULAWIN SECTION, SEGMENT 3, TANZA, CAVITE

Cavite 1st DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSMALABON GRANDE- SAN JUAN - MULAWIN DIVERSION ROAD, MULAWIN SECTION, SEGMENT 4, TANZA, CAVITE

Cavite 1st DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)
View all 185 projects →

4. Implementation

Contract Amount

₱49,021,966.45

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

January 9, 2018

Target End

August 6, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteCity of CaviteBarangay 41
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.