Roads20FB0161

CONCRETING OF BRGY. PAWA TO BRGY. NAGOTGOT FMR, BRGY. PAWA AND BRGY. NAGOTGOT, MANITO, ALBAY

CONCRETING OF BRGY. PAWA TO BRGY. NAGOTGOT FMR, BRGY. PAWA AND BRGY. NAGOTGOT, MANITO, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱12,052,074.97. Status: Past target date (DPWH On-Going). Contractor on record: NUMERICAL GATE CONST. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20FB0161 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    99% reported · imagery 2018-04-21 → 2025-10-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. PAWA TO BRGY. NAGOTGOT FMR, BRGY. PAWA AND BRGY. NAGOTGOT, MANITO, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of drainage and flood mitigation structures along Brgy. Puro, Legazpi City, Albay
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Albay 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

70 projects · ₱2.4B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-DARAGA URBAN TOURISM ECO ROUTE ROAD, ALBAY, DARAGA AND LEGAZPI CITY, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2024₱168.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-DARAGA URBAN TOURISM ECO ROUTE ROAD, ALBAY, BRGY. BUSAY, BRGY. BINITAYAN, BRGY. PAWA, ALBAY (2ND LEGISLATIVE DI

Region V, Region V

2023₱124.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - GUINOBATAN-JOVELLAR-DONSOL ROAD (ILULUAN - PARIAAN SECTION) LEADING TO PILAR PORT, CAMALIG, ALBAY

Albay 2nd DEO, Region V

2019₱96.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- CAMALIG BYPASS ROAD INCLUDING DRAINAGE SYSTEMS, ALBAY

Albay 2nd DEO, Region V

2023₱96.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DARAGA URBAN TOURISM ECO ROUTE (DUTERTE) PROJECT, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2020₱86.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/REHABILITATION OF COTMON-HOYOP-HOYOPAN FLOOD CONTROL SYSTEM, BRGY. COTMON, CAMALIG, ALBAY

Albay 2nd DEO, Region V

2020₱74.8M
Reported complete (DPWH)
View all 70 projects →

4. Implementation

Contract Amount

₱12,052,074.97

Progress

Past target date (DPWH On-Going)

Start Date

September 16, 2020

Target End

December 21, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayManitoPawa
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.