REPAIR/ REHAB./IMPRVT. OF FLOOD CONTROL STRUCTURES; UPSTREAM OF CALBAYOG RIVER, CALBAYOG CITY, SAMAR 1ST LD
REPAIR/REHAB./IMPRVT. OF FLOOD CONTROL STRUCTURES; UPSTREAM OF CALBAYOG RIVER, CALBAYOG CITY, SAMAR 1ST LD is a DPWH-tracked public work in Samar 1st DEO, Region VIII. Reported contract value: ₱43,714,691.02. Status: Reported complete (DPWH). Contractor on record: B VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST. Figures trace to dpwh.
DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.
No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.
Total Contract Cost

