Water Provision and Storage25DC0230

CONSTRUCTION OF RAINWATER COLLECTORS SYSTEM (RWCS) 1. MUNICIPAL HALL COMPOUND, BRGY. POBLACION I, SANTA TERESITA, BATANGAS; 2. CALAYAAN COVERED COURT, BRGY. CALAYAAN, SANTA TERESITA, BATANGAS; 3. IRUKAN-KALAYAAN ELEMENTARY SCHOOL, BRGY. IRUKAN, SANTA TERE

CONSTRUCTION OF RAINWATER COLLECTORS SYSTEM (RWCS) 1. MUNICIPAL HALL COMPOUND, BRGY. POBLACION I, SANTA TERESITA, BATANGAS; 2. CALAYAAN COVERED COURT, BRGY. CALAYAAN, SANTA TERESITA, BATANGAS; 3. IRUKAN-KALAYAAN ELEMENTARY SCHOOL, BRGY. IRUKAN, SANTA TERE is a DPWH-tracked public work in Batangas 3rd DEO, Region IV-A. Reported contract value: ₱2,540,108.00. Status: Past target date (DPWH On-Going). Contractor on record: GAWANATO CONST CORP. Figures trace to dpwh.

Batangas 3rd DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱2,540,108 · GAWANATO CONST CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    0% reported · imagery 2021-06-15 → 2025-04-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF RAINWATER COLLECTORS SYSTEM (RWCS) 1. MUNICIPAL HALL COMPOUND, BRGY. POBLACION I, SANTA TERESITA, BATANGAS; 2. CALAYAAN COVERED COURT, BRGY. CALAYAAN, SANTA TERESITA, BATANGAS; 3. IRUKAN-KALAYAAN ELEMENTARY SCHOOL, BRGY. IRUKAN, SANTA TERE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Brgy. New Danglayan, Bauan, Batangas
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Batangas 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25DC0230 - Construction of Rainwater Collectors Sy

₱2,540,108.00 · GAWANATO CONST CORP

Contractor

C

45 projects · ₱381.3M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY CUTANG CAWAYAN, STA. TERESITA, BATANGAS

Batangas 3rd DEO, Region IV-A

2025₱52.8M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, TALISAY-LAUREL-AGONCILLO RD

Batangas 3rd DEO, Region IV-A

2024₱49.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATON PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, TANAUAN-TALISAY-TAGAYTAY RD

Batangas 3rd DEO, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN LOOC ELEMENTARY SCHOOL, BARANGAY LOOC, BALETE, BATAN

Batangas 3rd DEO, Region IV-A

2024₱19.9M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM, CONSTRUCTION OF SOLAR WATER SYSTEM BARANGAY TALISAY, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2023₱19.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DRAINAGE SYSTEM AT BARANGAY PUSIL, LIPA CITY BATAN

Batangas 4th DEO, Region IV-A

2025₱19.0M
Past target date (DPWH On-Going)
View all 45 projects →

4. Implementation

Contract Amount

₱2,540,108.00

Progress

Past target date (DPWH On-Going)

Start Date

July 1, 2025

Target End

September 28, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)BatangasSanta TeresitaPoblacion I
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.